Recycling equipment is sold by capacity, but the capacity figure means something different in each stream: modules per shift for photovoltaics, tonnes per hour for aluminium and battery feed. This guide puts the three on one page with the power, footprint, crew and capital each size actually needs.
The three streams side by side
| Line | Rated capacity | Installed power | Footprint | Capital, indicative |
|---|---|---|---|---|
| PV line, bench scale | 120–150 modules/shift | 32–45 kW | 11 × 5 m | USD 150k–230k |
| PV line, single position | 200–300 modules/shift | 48–65 kW | 18 × 6 m | USD 210k–310k |
| PV line, two positions | 450–500 modules/shift | 72–88 kW | 24 × 7 m | USD 340k–480k |
| PV line, three positions | 900–1,500 modules/shift | 95–110 kW | 34 × 9 m | USD 520k–760k |
| UBC decoating line, 1 t/h | 1 t/h coated cans | 42–58 kW | 18 × 5 m | USD 240k–340k |
| UBC decoating line, 2 t/h | 2 t/h coated cans | 75–90 kW | 22 × 8 m | USD 380k–540k |
| UBC decoating line, 5 t/h | 5 t/h, twin drum | 150–190 kW | 34 × 8 m | USD 780k–1.05M |
| Battery sorting line, 0.5 t/h | 0.5 t/h packs and cells | 65–85 kW | 16 × 7 m | USD 300k–450k |
| Battery sorting line, 1 t/h | 1 t/h packs and cells | 110–140 kW | 26 × 10 m | USD 450k–680k |
| Battery sorting line, 2 t/h | 2 t/h packs and cells | 190–240 kW | 30 × 9 m | USD 820k–1.15M |
Capacity is set by positions and dwell, not by belt speed
In PV recycling the constraint is the number of module positions on the frame remover and the dwell time in the delamination furnace. Belt speed can always be increased; what cannot be increased is how many modules can be heated at once without the encapsulant burning rather than softening. That is why a line quoted at “1,000 modules per shift” is usually three positions of 300, not one position run faster.
In aluminium decoating the constraint is heat transfer into the flake bed. A tonne of coated cans carries 30–50 kg of organics that must be volatilised without letting the metal exceed 560 °C. The throughput follows from the burner duty and the afterburner capacity, which is why lines are quoted with a gas consumption figure per tonne rather than a belt speed.
In battery processing the constraint is safety, not mechanics: discharge, inert atmosphere and the separation of the electrolyte fraction decide how fast the line can run before it becomes a fire risk. Our lines are quoted with a nitrogen consumption figure for the same reason.
Decoating, chip drying and factory scrap
| Line | Rated capacity | Installed power | Footprint | Capital, indicative |
|---|---|---|---|---|
| Chip de-oiling line, 0.5 t/h | 0.5 t/h wet swarf | 22–30 kW | 9 × 4 m | USD 78k–135k |
| Chip de-oiling line, 1 t/h | 1 t/h wet swarf | 38–50 kW | 14 × 5 m | USD 135k–215k |
| Chip de-oiling line, 2 t/h | 2 t/h wet swarf | 68–85 kW | 20 × 6 m | USD 230k–360k |
| Coated aluminium tunnel, 1 t/h | 1 t/h sheet and profile | 34–45 kW | 22 × 6 m | USD 145k–225k |
| Coated aluminium tunnel, 3 t/h | 3 t/h sheet and profile | 50–65 kW | 28 × 7 m | USD 295k–430k |
| Coated aluminium tunnel, 5 t/h | 5 t/h, five zones | 95–120 kW | 40 × 8 m | USD 620k–900k |
| PV factory scrap line, 0.5 t/h | 0.5 t/h cell and trim scrap | 18–24 kW | 7 × 4 m | USD 62k–98k |
| PV factory scrap line, 1 t/h | 1 t/h cell and trim scrap | 30–40 kW | 12 × 5 m | USD 96k–155k |
| PV factory scrap line, 2 t/h | 2 t/h, two-stage crushing | 55–70 kW | 18 × 6 m | USD 165k–250k |
Guides in this section
- 300 modules/shift PV lineEntry size, one position
- 500 modules/shift PV lineTwo positions, regional depot
- 1,000 modules/shift PV lineThree positions, utility scale
- 2 t/h UBC decoating lineCan and flake decoating
- 1 t/h battery sorting lineDischarge, dismantling, separation
- 5 t/h UBC lineTwin drum for a smelter feed
- 2 t/h battery sorting lineTwo-shift pack processing
- 2 t/h chip de-oilingSwarf from a large machining shop
- 5 t/h coated aluminiumFive-zone tunnel
- Solar panel recycling line costWhere the money goes
- 3 t/h coated aluminiumSheet and profile
- Chip de-oiling lineSwarf from machining
- PV factory scrapClean single-origin scrap
- 2 t/h PV factory scrapTwo-stage crushing, 97 % glass
- Decoating vs direct meltingBreak-even by coating level
- All recycling solutionsFlowsheets by material
MSK network
Aggregates and mining equipment: mskmachinery.com. Export contracts: Sino Qtech Industries.
Manufacturer and compliance facts
Henan MSK Machinery Co., Ltd. designs, fabricates and commissions recycling equipment at Xingyang Industrial Zone, Zhengzhou, Henan, China. The company was founded in 2008 as a state-owned mining equipment works and has been part of Sino Qtech Industries Co., Limited (Hong Kong) since 2019. Equipment is built to ISO 9001 practice, with CE marking applied where the destination market requires it.
References used in this page’s engineering claims: EU WEEE Directive 2012/19/EU · Basel Convention on waste shipments · US DOE — Waste Reduction & Recycling · ISO 9001 quality management
Questions buyers ask before the proposal
How do I convert modules per shift into tonnes per hour?
A 60-cell module weighs about 19 kg and a 72-cell about 23 kg. Three hundred modules per 8-hour shift is roughly 6.3 t of feed, or 0.8 t/h average with peaks near 1.4 t/h.
What decides the price of a recycling line?
Thermal scope and emission control, not the mechanical conveyors. A furnace with an afterburner and heat recovery is typically 35–45 % of the line cost.
Can a line be extended later?
Yes for PV and battery lines: add positions or stations to the same frame. Aluminium decoating is harder because the burner and afterburner are sized together, so the second line is usually a separate unit.
What permits are usually required?