1 t/h Lithium Battery Discharge & Sorting Line
Battery feed is the one recycling stream where the safety case comes before the metallurgy. One tonne an hour is the size that lets a single plant handle mixed consumer and small EV packs with a discharge stage, an inert atmosphere and a separation train that keeps the black mass clean enough to sell.
Stations
| Station | Function | Power | Control point |
|---|---|---|---|
| Discharge rack | Controlled discharge of packs and loose cells in brine or resistive load | 9 kW | Cell voltage logged per batch |
| Inert dismantling | Removes BMS, cabling and casing under nitrogen | 15 kW | O₂ below 8 % |
| Crushing and sieving | Reduces cells, separates casing from electrode mass | 55 kW | Inert, water-cooled |
| Density separation | Separates black mass, copper, aluminium and separator | 30 kW | Black mass purity ≥ 96 % |
| Magnetic and eddy separation | Steel casing and aluminium fines | 12 kW | Steel fraction below 1 % Cu |
| Off-gas and scrubbing | HF and electrolyte vapour control | 14 kW | Stack monitoring |
Why this line is rated in tonnes of feed and not tonnes of output
A tonne of mixed lithium battery feed yields 250–350 kg of black mass, 150–250 kg of copper and aluminium foil, 200–300 kg of casing and the balance as electrolyte, separator and losses. The output mass is roughly half the input, and the value sits almost entirely in the black mass — which is why the purity specification, not the throughput, decides the plant’s revenue.
The discharge stage is the bottleneck nobody budgets for. Packs arrive at different states of charge, and a pack at 60 % state of charge takes 8–14 hours on a resistive rack. A 1 t/h line therefore needs a rack sized for at least three days of feed, not one shift, or the plant runs out of discharged material and starts skipping the stage. Skipping it is how fires start in the crusher.
Safety scope, stated plainly
The line is built with nitrogen blanketing on the dismantling and crushing compartments, temperature and oxygen monitoring, a deluge system on the discharge rack, and pressure-relief ducting on the crusher. Operators work behind a barrier during crushing. None of this is optional, and any quotation that omits it should be read as a mechanical line only.
Operating figures
| Item | Value | Notes |
|---|---|---|
| Energy per tonne | 55–85 kWh | Crusher and separation dominate |
| Nitrogen per tonne | 1.8–2.6 t | Higher for packs with large void volume |
| Black mass output | 250–350 kg/t | Purity 96–98 % |
| Crew | 5 per shift | Two on dismantling, one control room |
| Capital, indicative | USD 450k–680k | EXW, excluding civils and N₂ plant |
Related pages
MSK network
Aggregates and mining equipment: mskmachinery.com. Export contracts: Sino Qtech Industries.
Manufacturer and compliance facts
Henan MSK Machinery Co., Ltd. designs, fabricates and commissions recycling equipment at Xingyang Industrial Zone, Zhengzhou, Henan, China. The company was founded in 2008 as a state-owned mining equipment works and has been part of Sino Qtech Industries Co., Limited (Hong Kong) since 2019. Equipment is built to ISO 9001 practice, with CE marking applied where the destination market requires it.
References used in this page’s engineering claims: EU WEEE Directive 2012/19/EU · Basel Convention on waste shipments · US DOE — Waste Reduction & Recycling · ISO 9001 quality management
Questions buyers ask before the proposal
Can the line take whole EV packs?
Packs up to about 400 kg can be dismantled on the bench after discharge; larger vehicle packs must be opened and modules removed first. The line is laid out with a pack bay for that reason.
What purity of black mass is realistic?
96–98 % with a well-run density and magnetic separation. Copper contamination above 1 % is the usual failure, and it comes from insufficient sieving after crushing.
Is nitrogen generation included?
Not in the base scope. A PSA nitrogen plant sized for 25 Nm³/h adds roughly USD 28k–45k and removes the dependency on cylinder delivery.
What permits does a battery line need?
Hazardous-waste handling, fire-safety approval for stored cells, air-emission approval for the thermal and scrubbing stages, and in the EU a producer-responsibility registration. Requirements differ by country.