Recycling Line Capacity Guide

Recycling equipment is sold by capacity, but the capacity figure means something different in each stream: modules per shift for photovoltaics, tonnes per hour for aluminium and battery feed. This guide puts the three on one page with the power, footprint, crew and capital each size actually needs.

200–1,500PV modules per shift
1–8 t/hUBC decoating range
0.3–2 t/hBattery sorting range
48–180 kWInstalled power across lines

The three streams side by side

Line Rated capacity Installed power Footprint Capital, indicative
PV line, single position 200–300 modules/shift 48–65 kW 18 × 6 m USD 210k–310k
PV line, three positions 900–1,500 modules/shift 95–110 kW 34 × 9 m USD 520k–760k
UBC decoating line 2 t/h coated cans 75–90 kW 22 × 8 m USD 380k–540k
Battery sorting line 1 t/h packs and cells 110–140 kW 26 × 10 m USD 450k–680k

Capacity is set by positions and dwell, not by belt speed

In PV recycling the constraint is the number of module positions on the frame remover and the dwell time in the delamination furnace. Belt speed can always be increased; what cannot be increased is how many modules can be heated at once without the encapsulant burning rather than softening. That is why a line quoted at “1,000 modules per shift” is usually three positions of 300, not one position run faster.

In aluminium decoating the constraint is heat transfer into the flake bed. A tonne of coated cans carries 30–50 kg of organics that must be volatilised without letting the metal exceed 560 °C. The throughput follows from the burner duty and the afterburner capacity, which is why lines are quoted with a gas consumption figure per tonne rather than a belt speed.

In battery processing the constraint is safety, not mechanics: discharge, inert atmosphere and the separation of the electrolyte fraction decide how fast the line can run before it becomes a fire risk. Our lines are quoted with a nitrogen consumption figure for the same reason.

Sizing rule: build for the collection volume you can prove, not the volume you hope for. A PV line fed 120 modules a day on a 300-module line runs at 40 % and never pays back; the same money spent on a single-position line plus a second shift is a better plant.

Decoating, chip drying and factory scrap

Line Rated capacity Installed power Footprint Capital, indicative
Chip de-oiling line 0.5 t/h wet swarf 22–30 kW 9 × 4 m USD 78k–135k
Coated aluminium tunnel 3 t/h sheet and profile 50–65 kW 28 × 7 m USD 295k–430k
PV factory scrap line 1 t/h cell and trim scrap 30–40 kW 12 × 5 m USD 96k–155k

Guides in this section

MSK network

Aggregates and mining equipment: mskmachinery.com. Export contracts: Sino Qtech Industries.

Manufacturer and compliance facts

Henan MSK Machinery Co., Ltd. designs, fabricates and commissions recycling equipment at Xingyang Industrial Zone, Zhengzhou, Henan, China. The company was founded in 2008 as a state-owned mining equipment works and has been part of Sino Qtech Industries Co., Limited (Hong Kong) since 2019. Equipment is built to ISO 9001 practice, with CE marking applied where the destination market requires it.

Legal entityHenan MSK Machinery Co., Ltd.
WorksXingyang Industrial Zone, Zhengzhou, Henan 450100, CN
Second siteGongyi — castings, wear parts, heat treatment
Export contractorSino Qtech Industries Co., Limited, Hong Kong
Quality systemISO 9001 practice; CE on request
Contact+86 133 5377 2661 · [email protected]

References used in this page’s engineering claims: EU WEEE Directive 2012/19/EU · Basel Convention on waste shipments · US DOE — Waste Reduction & Recycling · ISO 9001 quality management

Questions buyers ask before the proposal

How do I convert modules per shift into tonnes per hour?

A 60-cell module weighs about 19 kg and a 72-cell about 23 kg. Three hundred modules per 8-hour shift is roughly 6.3 t of feed, or 0.8 t/h average with peaks near 1.4 t/h.

What decides the price of a recycling line?

Thermal scope and emission control, not the mechanical conveyors. A furnace with an afterburner and heat recovery is typically 35–45 % of the line cost.

Can a line be extended later?

Yes for PV and battery lines: add positions or stations to the same frame. Aluminium decoating is harder because the burner and afterburner are sized together, so the second line is usually a separate unit.

What permits are usually required?

Air emissions for thermal processes, wastewater for washing stages, and hazardous-waste handling for battery and e-waste fractions. Requirements differ by country and should be confirmed before ordering.

Tell us the material and the tonnage

We size the line from your feed analysis, not from a catalogue page — proposal and layout within one working week.