A tonne an hour is what a can collector actually accumulates: a few hundred kilos a day from bars, events and municipal bins, baled and stacked until there is enough to ship. Decoated on site, that material stops being a low-grade bale and becomes a furnace charge that a secondary smelter will take without a discount.
What the line takes
Baled or loose used beverage cans, with the steel food cans and PET bottles picked out. The line will tolerate a small share of aerosol and paint tins, but they carry solvent and propellant that spike the afterburner load, so they are better run as a separate batch at reduced rate than mixed into a normal day.
| Feed property | Limit | Consequence if exceeded |
|---|---|---|
| Bale density | Up to 350 kg/m³ | Breaker stalls on tight export bales |
| Surface moisture | Below 2 % | Steam load in the drum, longer dwell |
| Ferrous content | Below 0.5 % | Wears the shredder hammers |
| Residual liquid | No free liquid | Burner instability, wet flake |
| Paint load | 3–5 % of mass | Sets afterburner sizing |
Cans that have been stored outdoors for a season arrive with grit in the seams, and grit becomes dust in the drum and load on the bag filter. A coarse screen over the feed hopper costs little and keeps the filter interval in weeks rather than days.
Sequence and settings
| Stage | Function | Power | Key setting |
|---|---|---|---|
| Bale breaker and shredder | Opens bales, reduces to 30–60 mm flake | 22 kW | Flake size governs dwell |
| Dryer | Drives off surface water before the drum | 5.5 kW | Feed below 2 % moisture |
| Rotary decoater | Low-oxygen burn-off of lacquer and print | 4 kW drive + burner | 480–520 °C, 6–9 min dwell |
| Afterburner | Destroys volatiles ahead of the stack | 4 kW | Sized on the worst 15 minutes |
| Cooling and discharge | Indirect cooling, dust take-off | 3 kW | Discharge below 120 °C |
A single drum at this size runs with a longer dwell than its two-tonne cousin, because the smaller diameter gives less residence per metre of length. That is an advantage for thin-wall cans, which overheat quickly: the drum can be held at the low end of the band and still finish the burn, where a large drum pushed to one tonne an hour would need a higher set point to compensate for short contact time.
Space, gas and power
Eighteen by five metres covers feed, drum, afterburner and discharge, with the stack outside the wall. The layout puts the burner end away from the operator position, which matters more than it sounds: the drum radiates heavily and a control desk beside it becomes uncomfortable by mid-shift.
| Service | Requirement | Note |
|---|---|---|
| Electrical | 58 kW installed, 80 kVA supply | Shredder is the largest single load |
| Gas | 12–18 m³/h | Burner plus afterburner pilot |
| Compressed air | 6 bar, 0.4 m³/min | Damper and valve actuation |
| Water | None in process | Quench option on discharge |
| Stack | 4 m above ridge | Thermocouple and sample port |
Running cost per tonne
Gas per tonne is higher here than on a two-tonne line because the drum’s surface-to-volume ratio is worse and the afterburner duty is spread over less material. The gap is roughly 15–20 %, which is worth knowing before comparing quotations on gas figures alone.
| Item | Value | Notes |
|---|---|---|
| Gas | 34–44 m³/t | Natural gas; LPG 13–17 kg/t |
| Heat recovery | 55–70 % of burner duty | Combustion air and dryer |
| Metal loss | 1.2–2.0 % | Rises with dirty or wet feed |
| Organics removed | 3–5 % of mass | Paint, lacquer, residual sugar |
| Crew | 2 per shift | One on the burner and controls |
| Capital, indicative | USD 240k–340k | EXW, excluding civils and stack |
Buyer scope and the mistakes that cost most
On the buyer’s side: a level pad, an 80 kVA supply, gas and air, the stack and its emission permit, a 2 t forklift with a bale clamp, and two operators. Commissioning takes four to six days, most of it burner tuning and the furnace dry-out.
The expensive mistake at this size is buying the drum without the shredder, on the assumption that loose cans can be fed directly. Whole cans bridge in the inlet, decoat unevenly and carry their labels out intact; the shredder is what makes the dwell time predictable. The second mistake is omitting the afterburner to save capital, which usually ends with a stack complaint and a retrofit that costs more than the original option.
Where the feed regularly exceeds 1.5 t/h, the 2 t/h line is the correct unit, not this one run harder: the drum volume, the afterburner and the cooler all scale together, and pushing the small unit simply moves unburnt lacquer into the customer’s furnace.
MSK Machinery supplies this size with a feed trial on the buyer’s own bales before the drum diameter is fixed. The line is manufactured by Henan MSK Machinery Co., Ltd. of Xingyang, Zhengzhou, Henan, and the Alibaba storefront at https://sinoqtech.en.alibaba.com/ can be used to confirm the trading entity independently.
Related pages
MSK network
Aggregates and mining equipment: mskmachinery.com. Export contracts: Sino Qtech Industries.
Manufacturer and compliance facts
Henan MSK Machinery Co., Ltd. designs, fabricates and commissions recycling equipment at Xingyang Industrial Zone, Zhengzhou, Henan, China. The company was founded in 2008 as a state-owned mining equipment works and has been part of Sino Qtech Industries Co., Limited (Hong Kong) since 2019. Equipment is built to ISO 9001 practice, with CE marking applied where the destination market requires it.
References used in this page’s engineering claims: EU WEEE Directive 2012/19/EU · Basel Convention on waste shipments · US DOE — Waste Reduction & Recycling · ISO 9001 quality management
Questions buyers ask before the proposal
How many cans make up 1 t of feed?
Roughly 62,000–68,000 used beverage cans, depending on wall thickness and how well they are crushed. That is about 55–65 m³ of loose cans before baling.
What dwell time does a 1 t/h drum need?
Six to nine minutes at 480–520 °C. Thin-wall cans sit at the low end of the band; heavier food-can stock needs the longer end to burn the internal coating.
Is a shredder mandatory at 1 t/h?