Five tonnes an hour is a decoater that feeds a smelter rather than a dealer. It runs architectural profile, coated sheet and foil in campaigns, five zones over twenty-four metres of heated length, and it holds metal loss low enough that the output sells close to primary grade instead of at a mixed-scrap discount.

5 t/hCoated feed
0.7–1.3 %Metal loss
5 zonesOver 24 m heated
95–120 kWInstalled drives

Feed mix at five tonnes

At this rate the plant is fed by baled or loose deliveries from fabricators, window manufacturers and coil processors, and the mix changes week to week. The tunnel is programmed per campaign, and the campaign plan — not the equipment — determines how much of the nominal rating is actually used.

Section Share of typical feed Rate at full dwell
Profile 2–4 mm 40–55 % 4.2–4.6 t/h
Sheet 0.5–1.5 mm 25–35 % 5.0–5.5 t/h
Foil 0.05–0.2 mm 10–20 % 6.0 t/h, belt speed limited
Mixed unsorted Avoid 3.5 t/h and poor quality

Mixed unsorted feed is the single largest destroyer of value in a plant this size. The dwell needed for 4 mm profile scorches foil, and the operator’s usual response is to slow the belt for everything, which cuts throughput by a third. Sorting into campaigns costs a yard and a telehandler and returns far more than it costs.

Five zones over 24 m

Zone Set point (profile) Function
Zone 1 470 °C Heat-through, drives off surface moisture
Zone 2 510 °C Film ignition, main volatile release
Zone 3 530 °C Burn-out of the primer layer
Zone 4 520 °C Hold, allows section core to catch up
Zone 5 480 °C Soak and controlled cool before discharge

The fourth zone is what distinguishes a five-zone tunnel from a three-zone one run hotter. Heavy profile arrives at zone 4 with its core still below the surface temperature; without the hold, the surface oxidises while the paint in the section root survives. The hold costs gas and saves metal, and on 4 mm profile it is the difference between 1.3 % loss and 2 %.

Stage Equipment Power Key setting
Feed Belt loader, 1.8 m, spreader 7.5 kW Layer below 60 mm
Tunnel Mesh belt, 5 zones, 24 m heated 22 kW drives Burners on zones 1–3
Cooling Forced air, 6 m, two stages 11 kW Below 150 °C at the baler
Off-gas Cyclone, afterburner, bag filter 22 kW 850 °C, 2 s, continuous logging
Discharge Baler, 5 t/h 30 kW Bale 40–60 kg

Layout, heat recovery and the stack

Forty by nine metres, with the tunnel on a raised plinth so the baler can sit below the discharge. The building needs 9 m of clear height over zone 3 for the hood and duct, and the stack should be sized for the afterburner at peak, not average, because a stack test will be run at full rate.

Service Requirement Note
Electrical 120 kW installed, 160 kVA supply Baler and off-gas fans largest
Gas 55–80 m³/h at full rate Zones plus afterburner
Heat recovery 60–75 % of burner duty Zone 1 and dryer preheat
Compressed air 6 bar, 0.9 m³/min Dampers and bag pulse
Water 1 m³/day Cooling circuit make-up
Stack 6 m above ridge Platform and sample ports

Cost per tonne

Item Value Notes
Gas 28–38 m³/t Lower than short tunnels
Electrical energy 32–46 kWh/t Fans, drives, baler
Metal loss 0.7–1.3 % Profile at the top of the range
Mesh belt life 12–18 months Longer than a short tunnel’s
Crew 4 per shift Charging, zones, discharge, yard
Capital, indicative USD 620k–900k EXW, excluding civils and stack
The output is a furnace charge, so sell it as one. Bright, paint-free, single-alloy bales command a small discount to primary; mixed bales of the same metal command a large one. Two discharge bins and a documented purge are worth more per tonne than any single piece of equipment on the line.

Buyer scope, contract points, and what to watch

The buyer supplies the building with 9 m clearance at the hood, the plinth and foundations, the 160 kVA supply, gas at 80 m³/h peak, the stack and its permit, a 5 t forklift with a bale clamp, and the yard for campaign storage. Erection and commissioning take four to six weeks, with a five-day performance run on each section range.

Contract points to fix in writing: guaranteed metal loss per section range, the afterburner duty at peak, the stack limits the design is tested against, and the belt speed range that achieves the rated dwell. The last one is often omitted, and it is the number that decides whether five tonnes is reachable at all on heavy profile.

Two traps. The first is assuming the baler can absorb the line rate — a 5 t/h tunnel needs a baler rated above it, and a 3 t/h baler becomes the bottleneck within a week. The second is planning campaigns around alloy rather than section: both matter, but section sets the dwell and alloy sets the price, and the yard layout has to serve both.

Below about three tonnes an hour the three-zone tunnel does the same work with less capital; above five, two parallel tunnels are usually cheaper than one wider belt, because a 2.4 m belt tracks badly at temperature.

MSK Machinery supplies this tunnel with the zone programme and the campaign plan written together, since one is useless without the other. Manufacture is by Henan MSK Machinery Co., Ltd. of Xingyang, Zhengzhou, Henan, and the trading entity can be confirmed at https://sinoqtech.en.alibaba.com/ before the letter of credit is opened.

Related pages

MSK network

Aggregates and mining equipment: mskmachinery.com. Export contracts: Sino Qtech Industries.

Manufacturer and compliance facts

Henan MSK Machinery Co., Ltd. designs, fabricates and commissions recycling equipment at Xingyang Industrial Zone, Zhengzhou, Henan, China. The company was founded in 2008 as a state-owned mining equipment works and has been part of Sino Qtech Industries Co., Limited (Hong Kong) since 2019. Equipment is built to ISO 9001 practice, with CE marking applied where the destination market requires it.

Legal entityHenan MSK Machinery Co., Ltd.
WorksXingyang Industrial Zone, Zhengzhou, Henan 450100, CN
Second siteGongyi — castings, wear parts, heat treatment
Export contractorSino Qtech Industries Co., Limited, Hong Kong
Quality systemISO 9001 practice; CE on request
Contact+86 133 5377 2661 · [email protected]

References used in this page’s engineering claims: EU WEEE Directive 2012/19/EU · Basel Convention on waste shipments · US DOE — Waste Reduction & Recycling · ISO 9001 quality management

Questions buyers ask before the proposal

Why 5 zones instead of 3 at this rate?

The fourth zone holds temperature while the core of heavy profile catches up. Without it the surface oxidises before the paint in the section root burns, which costs 0.5–0.7 % of metal.

How much gas does the tunnel use per 1 t?

28–38 m³ of natural gas per tonne at full rate, against 38–52 m³ on a one-tonne short tunnel. The saving comes from 24 m of heated length and 60–75 % heat recovery.

What belt speed gives the 12–16 min dwell?

For profile at 12–16 minutes dwell, 1.5–2.0 m/min over 24 m of heated length. Foil runs at 5–6 m/min for its 4–5 minutes.

Tell us the material and the tonnage