Xingyang Industrial Zone, Zhengzhou, Henan, China

2 t/h Aluminium Chip Drying Line

Two tonnes an hour is a collector’s number, not a machine shop’s. It means several suppliers, several alloys and deliveries that arrive wet, mixed and occasionally mislabelled — and it means the drying line has to be laid out for segregation as much as for evaporation.

2 t/hWet swarf feed
< 0.3 %Residual oil after drying
68–85 kWInstalled power
20 × 6 mFootprint

Feed from several shops, arriving mixed

At this rate the line takes chip from five to fifteen suppliers. Each brings a different alloy, a different chip form and a different fluid: one shop runs neat cutting oil, the next runs a water-miscible emulsion, a third sends saw swarf mixed with fines. The line handles all of it, but the value is destroyed if they are blended in the reception pit.

Feed Typical range Handling decision
Alloy 6061, 6082, 7075, 5083 Separate bins at reception
Chip form Turnings, milling chip, saw swarf Swarthrough a coarse basket
Cutting fluid Neat oil 2–6 %, emulsion 4–9 % Sets dryer duty per tonne
Fines Below 1 mm, up to 8 % Diverted to a filter press
Tramp metal Bolts, inserts, steel swarf Magnet ahead of the centrifuge
Moisture Free liquid in the bottom of bins Decanted before tipping

Segregation is where the margin sits. Clean 6061 turning chip sells as a grade; the same metal blended with 7075 becomes mixed scrap at a discount of 15–25 %. That discount is larger than the entire drying cost per tonne, which is why the reception layout deserves more thought than the dryer specification.

Sequence and power

Stage Function Power Key setting
Reception and drain bins Alloy segregation, free-fluid decant 4 kW One bin per alloy
Magnet and vibrating screen Tramp metal and fines removal 2.2 kW 10 mm aperture ahead of basket
Centrifuge Free-fluid removal, 85–90 % 37 kW Basket 800 mm, 1,050 rpm
Indirect dryer Residual film evaporation, no flame contact 22 kW + heat Product 180–220 °C
Condenser Vapour recovery to liquid 5.5 kW 70–85 % of evaporated oil
Carbon polish and discharge Odour control, bagging or briquetting 3 kW Media change 3–6 months

One large centrifuge rather than two small ones is the right call here: basket diameter drives the separation more than basket count, and a single 800 mm machine at this rate produces a drier cake than two 600 mm units working in parallel. The redundancy argument that holds for crushers does not hold for centrifuges, which fail on wear parts that can be changed inside a shift.

Layout and utility load

Twenty by six metres, with reception at one end and dispatch at the other so that wet and dry material never share a traffic path. The dryer sits high enough to discharge by gravity into the bagging hopper, and the condenser is placed outside the wall to keep its heat out of the working area.

Service Requirement Note
Electrical 85 kW installed, 110 kVA supply Centrifuge on a soft starter
Heat 30–46 kWh/t thermal Gas, electric or waste heat
Compressed air 6 bar, 0.5 m³/min Valves and bag pulse
Water None in process Sump for spill only
Extraction 2,500 m³/h Carbon polish on outlet
Floor 2 t/m², bunded reception Fluid spills contained

Briquetting, and why it belongs at this size

Two tonnes an hour of loose chip is 8–13 m³ of trailer space per tonne, and freight at that bulk eats the margin on any haul over 300 km. A briquetter at 1.6–2.2 t/h raises density to 2.0–2.4 t/m³ and turns the output into a product a remelt furnace can charge without a special handling step.

The briquetter also changes the dryer specification. Briquetting damp chip produces briquettes that crack on drying and shed fines in the furnace; the residual oil limit matters more, not less, because a briquette traps the film inside the compact. Drying to below 0.3 % oil before pressing is what makes the briquette saleable rather than merely dense.

Cost per tonne, buyer scope and traps

Item Value Notes
Electrical energy 24–34 kWh/t Centrifuge and briquetter
Thermal energy 30–46 kWh/t Higher with emulsion feed
Recovered fluid 25–60 kg/t Depends on neat oil share
Crew 3 per shift Reception, line, dispatch
Capital, indicative USD 230k–360k EXW, without briquetter

Buyer scope: the building with a bunded reception area, the 110 kVA supply, heat source, extraction to atmosphere, a weighbridge or platform scale, and a forklift with a tipping bin attachment. Installation and commissioning take seven to ten days including a balance run on the centrifuge.

Trap one is buying the dryer before the reception layout, which locks in blending and a permanent discount on the output. Trap two is budgeting thermal energy on neat-oil figures: an emulsion-fed line evaporates three to five times more water per tonne and the heat bill follows. Trap three is skipping the scale — without inbound and outbound weights, the yield per supplier is unknown and the loss stays invisible.

MSK Machinery lays this line out from the reception side backwards, so the alloy bins and traffic path are fixed before the dryer is sized. The equipment is built by Henan MSK Machinery Co., Ltd. of Xingyang, Zhengzhou, Henan, and the trading entity can be verified at https://sinoqtech.en.alibaba.com/ before the order is placed.

Related pages

MSK network

Aggregates and mining equipment: mskmachinery.com. Export contracts: Sino Qtech Industries.

Manufacturer and compliance facts

Henan MSK Machinery Co., Ltd. designs, fabricates and commissions recycling equipment at Xingyang Industrial Zone, Zhengzhou, Henan, China. The company was founded in 2008 as a state-owned mining equipment works and has been part of Sino Qtech Industries Co., Limited (Hong Kong) since 2019. Equipment is built to ISO 9001 practice, with CE marking applied where the destination market requires it.

Legal entityHenan MSK Machinery Co., Ltd.
WorksXingyang Industrial Zone, Zhengzhou, Henan 450100, CN
Second siteGongyi — castings, wear parts, heat treatment
Export contractorSino Qtech Industries Co., Limited, Hong Kong
Quality systemISO 9001 practice; CE on request
Contact+86 133 5377 2661 · [email protected]

References used in this page’s engineering claims: EU WEEE Directive 2012/19/EU · Basel Convention on waste shipments · US DOE — Waste Reduction & Recycling · ISO 9001 quality management

Questions buyers ask before the proposal

How many suppliers can a 2 t/h line handle?

Five to fifteen regular suppliers at 2 t/h, with one reception bin per alloy. Beyond fifteen the segregation discipline breaks down unless a second reception bay is added.

Does a briquetter need chip below 0.3 % oil?

Yes. Pressing chip above 0.3 % residual oil traps the film inside the briquette and produces cracking and fines in the customer furnace, so drying comes first and pressing second.

What is the thermal demand per 1 t?

30–46 kWh thermal, at the top of the range for emulsion feed because three to five times more water has to be evaporated than with neat cutting oil.

Tell us the material and the tonnage

We size the line from your feed analysis, not from a catalogue page — proposal and layout within one working week.