5 t/h UBC Decoated Aluminium Line

Five tonnes an hour is a port-scale can operation — roughly a third of a million cans an hour, arriving as export bales from several collectors. At this size the decoater stops being a machine and becomes a small process plant: two drums, a shared afterburner, a heat-recovery loop and a control room that watches all of it.

5 t/hCoated can feed
2 drumsParallel decoating
65–80 %Heat recovery
150–190 kWInstalled power

Feed, and why bales get dirtier with distance

Material that travels far is compressed hard and stored long. Export bales at 300–400 kg/m³ arrive with grit in the seams, a share of steel food cans that the collector missed, and sometimes PET that was baled in by mistake. All three cost money in different places: grit in the bag filter, steel in the hammers, PET as a melted blob on the drum flight.

Feed property Limit for full rate Where it hurts
Bale density Up to 400 kg/m³ Breaker torque and hammer life
Ferrous Below 0.5 % Shredder hammers, drum flight
PET and organics Below 1 % Sticky deposits, afterburner load
Moisture Below 3 % Drum steam load, gas per tonne
Paint and print 3–5 % of mass Afterburner sizing and stack test

Magnetic separation before the shredder is not optional at five tonnes an hour. A single steel food can that reaches the drum can jam a flight and cost four hours of production; a magnet over the feed belt costs a fraction of that and removes the argument.

Twin drums and a shared afterburner

Stage Function Power Key setting
Bale breaker and shredder Two-stage opening, 30–60 mm flake 90 kW Hammer tip speed 38 m/s
Magnetic head pulley Removes ferrous before the dryer 1.5 kW Cleaned every 2 h
Dryer Surface moisture removal, indirect 18.5 kW Feed below 3 % moisture
Rotary decoater (×2) Low-oxygen burn-off, 2.5 t/h each 22 kW drives + burners 480–520 °C, 5–7 min dwell
Afterburner Shared volatile destruction 18 kW 850 °C, 2 s; sized on peak
Cooling and discharge Indirect cooler, dust take-off 15 kW Below 120 °C at the baler

Two drums give the plant something a single large unit cannot: turndown. Maintenance, a burner fault or a thin feed day can be met by running one drum at full rate while the other is serviced, and the line still delivers 2.5 t/h. That flexibility is worth more in a port operation than the small saving in capital from one bigger shell.

The afterburner, however, must be shared and sized for both drums at peak. Ducting each drum to its own small afterburner doubles the standing pilot load and the maintenance, and it makes the stack test twice as hard to pass.

Layout, utilities and the stack

Thirty-four by eight metres is the process line; the building needs another 150 m² for bale storage at two days of feed and 80 m² for decoated product. Bales should be stored under cover — wet bales cost gas and clog the dryer — and away from the drum end, because radiated heat softens the strapping on the stack next to it.

Service Requirement Note
Electrical 190 kW installed, 250 kVA supply Shredder on a soft starter
Gas 45–65 m³/h Two burners plus afterburner
Compressed air 6 bar, 1.2 m³/min Dampers, dust valves, purging
Water 2 m³/day Cooling circuit make-up
Stack 6 m above ridge Continuous temperature logging
Floor 4 t/m² under the drums Independent foundations

Per-tonne cost at five tonnes

Item Value Notes
Gas 24–32 m³/t Falls as recovery loop is tuned
Heat recovery 65–80 % of burner duty Dryer and combustion air preheat
Electrical energy 38–52 kWh/t Shredder dominates
Metal loss 0.9–1.5 % Better than small drums, cleaner feed
Crew 4 per shift One in the control room
Capital, indicative USD 780k–1.05M EXW, excluding civils and stack
At this scale the product is sold by specification, not by weight. Smelters buying decoated UBC want residual lacquer below 0.5 %, moisture below 0.3 % and a known iron content. A plant that can issue a per-batch analysis holds its price; one that ships by the tonne and hopes takes the discount.

Buyer scope, contract points and traps

The buyer supplies the building and foundations, the 250 kVA supply, gas at 65 m³/h peak, water, the stack and the emission permit, two forklifts with bale clamps, and the laboratory bench for batch analysis. Erection and commissioning take three to four weeks, with a five-day performance run at 90 % of rating before acceptance.

Contract points worth fixing in writing: the guaranteed metal loss on a stated feed, the afterburner duty at peak volatile load, the stack emission limits the design is tested against, and the drum shell thickness with its wear allowance. Vague wording on any of the four is where disputes start eighteen months later.

The trap at five tonnes is estimating gas from a two-tonne quotation. Small-drum figures do not scale down linearly; a plant of this size that budgets 38 m³/t will find itself 20 % over on fuel in the first quarter, before the recovery loop is balanced. Ask for the heat balance, not a single consumption number.

MSK Machinery builds this configuration with the drums on independent foundations so that one can be relined while the other runs. Manufacture is by Henan MSK Machinery Co., Ltd. of Xingyang, Zhengzhou, Henan, and the trading entity can be checked at https://sinoqtech.en.alibaba.com/ alongside the company registration.

Related pages

MSK network

Aggregates and mining equipment: mskmachinery.com. Export contracts: Sino Qtech Industries.

Manufacturer and compliance facts

Henan MSK Machinery Co., Ltd. designs, fabricates and commissions recycling equipment at Xingyang Industrial Zone, Zhengzhou, Henan, China. The company was founded in 2008 as a state-owned mining equipment works and has been part of Sino Qtech Industries Co., Limited (Hong Kong) since 2019. Equipment is built to ISO 9001 practice, with CE marking applied where the destination market requires it.

Legal entityHenan MSK Machinery Co., Ltd.
WorksXingyang Industrial Zone, Zhengzhou, Henan 450100, CN
Second siteGongyi — castings, wear parts, heat treatment
Export contractorSino Qtech Industries Co., Limited, Hong Kong
Quality systemISO 9001 practice; CE on request
Contact+86 133 5377 2661 · [email protected]

References used in this page’s engineering claims: EU WEEE Directive 2012/19/EU · Basel Convention on waste shipments · US DOE — Waste Reduction & Recycling · ISO 9001 quality management

Questions buyers ask before the proposal

What does 5 t/h mean in cans per hour?

About 320,000–340,000 used beverage cans an hour at 15 g average, or roughly 2.6 million in an eight-hour shift. Feed is normally export bales of 300–400 kg/m³.

Can 1 drum be serviced while the line runs?

Yes. Each drum has its own drive, burner and foundation, so one can be relined while the other holds 2.5 t/h. The shared afterburner stays in service for the running drum.

How much gas does the plant use per 1 t?

24–32 m³ of natural gas per tonne of coated feed once the recovery loop is balanced, against 34–44 m³/t on a one-tonne drum. The difference is mostly surface-to-volume ratio and preheat.