5 t/h UBC Decoated Aluminium Line
Five tonnes an hour is a port-scale can operation — roughly a third of a million cans an hour, arriving as export bales from several collectors. At this size the decoater stops being a machine and becomes a small process plant: two drums, a shared afterburner, a heat-recovery loop and a control room that watches all of it.
Feed, and why bales get dirtier with distance
Material that travels far is compressed hard and stored long. Export bales at 300–400 kg/m³ arrive with grit in the seams, a share of steel food cans that the collector missed, and sometimes PET that was baled in by mistake. All three cost money in different places: grit in the bag filter, steel in the hammers, PET as a melted blob on the drum flight.
| Feed property | Limit for full rate | Where it hurts |
|---|---|---|
| Bale density | Up to 400 kg/m³ | Breaker torque and hammer life |
| Ferrous | Below 0.5 % | Shredder hammers, drum flight |
| PET and organics | Below 1 % | Sticky deposits, afterburner load |
| Moisture | Below 3 % | Drum steam load, gas per tonne |
| Paint and print | 3–5 % of mass | Afterburner sizing and stack test |
Magnetic separation before the shredder is not optional at five tonnes an hour. A single steel food can that reaches the drum can jam a flight and cost four hours of production; a magnet over the feed belt costs a fraction of that and removes the argument.
Twin drums and a shared afterburner
| Stage | Function | Power | Key setting |
|---|---|---|---|
| Bale breaker and shredder | Two-stage opening, 30–60 mm flake | 90 kW | Hammer tip speed 38 m/s |
| Magnetic head pulley | Removes ferrous before the dryer | 1.5 kW | Cleaned every 2 h |
| Dryer | Surface moisture removal, indirect | 18.5 kW | Feed below 3 % moisture |
| Rotary decoater (×2) | Low-oxygen burn-off, 2.5 t/h each | 22 kW drives + burners | 480–520 °C, 5–7 min dwell |
| Afterburner | Shared volatile destruction | 18 kW | 850 °C, 2 s; sized on peak |
| Cooling and discharge | Indirect cooler, dust take-off | 15 kW | Below 120 °C at the baler |
Two drums give the plant something a single large unit cannot: turndown. Maintenance, a burner fault or a thin feed day can be met by running one drum at full rate while the other is serviced, and the line still delivers 2.5 t/h. That flexibility is worth more in a port operation than the small saving in capital from one bigger shell.
The afterburner, however, must be shared and sized for both drums at peak. Ducting each drum to its own small afterburner doubles the standing pilot load and the maintenance, and it makes the stack test twice as hard to pass.
Layout, utilities and the stack
Thirty-four by eight metres is the process line; the building needs another 150 m² for bale storage at two days of feed and 80 m² for decoated product. Bales should be stored under cover — wet bales cost gas and clog the dryer — and away from the drum end, because radiated heat softens the strapping on the stack next to it.
| Service | Requirement | Note |
|---|---|---|
| Electrical | 190 kW installed, 250 kVA supply | Shredder on a soft starter |
| Gas | 45–65 m³/h | Two burners plus afterburner |
| Compressed air | 6 bar, 1.2 m³/min | Dampers, dust valves, purging |
| Water | 2 m³/day | Cooling circuit make-up |
| Stack | 6 m above ridge | Continuous temperature logging |
| Floor | 4 t/m² under the drums | Independent foundations |
Per-tonne cost at five tonnes
| Item | Value | Notes |
|---|---|---|
| Gas | 24–32 m³/t | Falls as recovery loop is tuned |
| Heat recovery | 65–80 % of burner duty | Dryer and combustion air preheat |
| Electrical energy | 38–52 kWh/t | Shredder dominates |
| Metal loss | 0.9–1.5 % | Better than small drums, cleaner feed |
| Crew | 4 per shift | One in the control room |
| Capital, indicative | USD 780k–1.05M | EXW, excluding civils and stack |
Buyer scope, contract points and traps
The buyer supplies the building and foundations, the 250 kVA supply, gas at 65 m³/h peak, water, the stack and the emission permit, two forklifts with bale clamps, and the laboratory bench for batch analysis. Erection and commissioning take three to four weeks, with a five-day performance run at 90 % of rating before acceptance.
Contract points worth fixing in writing: the guaranteed metal loss on a stated feed, the afterburner duty at peak volatile load, the stack emission limits the design is tested against, and the drum shell thickness with its wear allowance. Vague wording on any of the four is where disputes start eighteen months later.
The trap at five tonnes is estimating gas from a two-tonne quotation. Small-drum figures do not scale down linearly; a plant of this size that budgets 38 m³/t will find itself 20 % over on fuel in the first quarter, before the recovery loop is balanced. Ask for the heat balance, not a single consumption number.
MSK Machinery builds this configuration with the drums on independent foundations so that one can be relined while the other runs. Manufacture is by Henan MSK Machinery Co., Ltd. of Xingyang, Zhengzhou, Henan, and the trading entity can be checked at https://sinoqtech.en.alibaba.com/ alongside the company registration.
Related pages
MSK network
Aggregates and mining equipment: mskmachinery.com. Export contracts: Sino Qtech Industries.
Manufacturer and compliance facts
Henan MSK Machinery Co., Ltd. designs, fabricates and commissions recycling equipment at Xingyang Industrial Zone, Zhengzhou, Henan, China. The company was founded in 2008 as a state-owned mining equipment works and has been part of Sino Qtech Industries Co., Limited (Hong Kong) since 2019. Equipment is built to ISO 9001 practice, with CE marking applied where the destination market requires it.
References used in this page’s engineering claims: EU WEEE Directive 2012/19/EU · Basel Convention on waste shipments · US DOE — Waste Reduction & Recycling · ISO 9001 quality management
Questions buyers ask before the proposal
What does 5 t/h mean in cans per hour?
About 320,000–340,000 used beverage cans an hour at 15 g average, or roughly 2.6 million in an eight-hour shift. Feed is normally export bales of 300–400 kg/m³.
Can 1 drum be serviced while the line runs?
Yes. Each drum has its own drive, burner and foundation, so one can be relined while the other holds 2.5 t/h. The shared afterburner stays in service for the running drum.
How much gas does the plant use per 1 t?
24–32 m³ of natural gas per tonne of coated feed once the recovery loop is balanced, against 34–44 m³/t on a one-tonne drum. The difference is mostly surface-to-volume ratio and preheat.