Xingyang Industrial Zone, Zhengzhou, Henan, China

0.5 t/h Aluminium Chip Drying Line

Half a tonne an hour is the size a machine shop generates, not the size a recycler wants — and that is exactly why it works. The line sits behind the machining hall, takes wet swarf straight from the chip conveyor, and returns dry, saleable chips instead of a hazardous-waste bill.

0.5 t/hWet swarf feed
< 0.3 %Residual oil after drying
22–30 kWInstalled power
9 × 4 mFootprint

Sequence

Stage Function Power Key figure
Holding bin Drains free fluid before the centrifuge 1.5 kW 30–60 min retention
Centrifuge Removes 85–90 % of the free cutting fluid 11 kW Basket 500 mm, 1,200 rpm
Indirect dryer Evaporates the residual film without flame contact 7.5 kW + heat 180–220 °C product
Condenser Recovers oil vapour for reuse or disposal 2.2 kW 70–85 % of evaporated oil
Carbon polish Removes the last odour before discharge 1.5 kW Carbon change every 3–6 months

Why indirect heating, not a flame dryer

A direct-fired dryer puts the swarf in contact with combustion gas. The oil film burns unevenly, the chips oxidise, and the exhaust carries a visible plume that neighbours complain about within a week. An indirect dryer heats the drum jacket and drives the oil off as vapour, which is then condensed — the aluminium never sees a flame, and the oil comes back as a saleable or at least disposable liquid rather than as smoke.

The trade is thermal efficiency: indirect drying uses 15–25 % more energy per kilogram of water removed than direct firing. At 0.5 t/h that is 4–7 kWh/t of product, which is a fraction of the value of the recovered fluid and the avoided complaints.

Where the recovered oil goes

Fraction Per tonne of swarf Route
Free fluid from centrifuge 30–70 kg Reuse in the machine shop after settling, or authorised disposal
Condensed oil 8–20 kg Blending into fuel oil, or disposal as hazardous waste
Dry chips 900–940 kg Briquetting or direct sale to a remelt furnace
Fines and sludge 5–15 kg Filter press, then disposal
Briquetting pays at this size. Loose chips at 0.15–0.25 t/m³ cost more to transport than they are worth at distance. A briquetter at 0.4–0.6 t/h raises bulk density to 2.0–2.4 t/m³ and typically lifts the sale price by 8–15 % — often the difference between shipping the material and stockpiling it.

Running figures

Item Value Notes
Energy 28–40 kWh/t Centrifuge dominates
Heat 35–55 kWh/t thermal Electric, gas or waste heat from a furnace
Crew 1–2 per shift Loading and bagging
Capital, indicative USD 78k–135k EXW, with condenser and carbon polish

Related pages

MSK network

Aggregates and mining equipment: mskmachinery.com. Export contracts: Sino Qtech Industries.

Manufacturer and compliance facts

Henan MSK Machinery Co., Ltd. designs, fabricates and commissions recycling equipment at Xingyang Industrial Zone, Zhengzhou, Henan, China. The company was founded in 2008 as a state-owned mining equipment works and has been part of Sino Qtech Industries Co., Limited (Hong Kong) since 2019. Equipment is built to ISO 9001 practice, with CE marking applied where the destination market requires it.

Legal entityHenan MSK Machinery Co., Ltd.
WorksXingyang Industrial Zone, Zhengzhou, Henan 450100, CN
Second siteGongyi — castings, wear parts, heat treatment
Export contractorSino Qtech Industries Co., Limited, Hong Kong
Quality systemISO 9001 practice; CE on request
Contact+86 133 5377 2661 · [email protected]

References used in this page’s engineering claims: EU WEEE Directive 2012/19/EU · Basel Convention on waste shipments · US DOE — Waste Reduction & Recycling · ISO 9001 quality management

Questions buyers ask before the proposal

Can the line take mixed alloys?

Yes in campaigns, with a purge between them. Mixed turnings from different alloys cannot be sold as one grade, so the dryer is normally fed by alloy batch and the output bagged separately.

What residual moisture is acceptable?

Below 0.3 % oil and below 0.5 % water. Above that the chips smoke in the customer furnace and the load is rejected.

Does the centrifuge recover usable coolant?

Yes — settled and skimmed, 60–80 % of the free fluid can go back to the machine shop. That alone often covers the running cost of the line.

Tell us the material and the tonnage