150 Modules per Shift PV Recycling Line

Most decommissioning work never arrives as a container load. Roofers, installers and municipal yards collect two or three pallets a week, and a line sized for a utility campaign would spend its life cold. This one is arranged around that trickle: 120–150 modules in an eight-hour shift, two operators, and a furnace allowed to cool between batches instead of burning gas to hold temperature.

120–150Modules per 8 h shift
≈0.4 t/hAverage feed
32–45 kWInstalled power
11 × 5 mLine footprint

Feed the line will accept

Framed 60- and 72-cell modules are the design case, and the clamp travel covers everything from a 1.0 m domestic panel to a 2.3 m utility module. Frameless laminate is accepted in campaigns after the glass-lift head is re-set; it bypasses the frame station and goes straight to the furnace, which is quicker but leaves the aluminium out of the recovered stream entirely.

Feed property Accepted range Effect on the line
Module size 1.0–2.3 m × 0.8–1.2 m Clamp and suction-head travel
Module mass 15–30 kg Sets the practical shift count
Front glass Tempered, 3.2 mm Lifts cleanly while the EVA bond is aged
Frame Anodised or mill-finish aluminium Corner keys cut, extrusion drawn
Rejects Shards under 100 mm, wet laminate, steel frames Diverted before the mill

Steel-framed modules turn up in pre-2005 installations and will damage the draw cylinder, so they are refused at the gate. Wet laminate from panels that stood in standing water blinds the suction cups; leave it in the yard for a week before feeding it.

Stations and installed power

Station Function Power Key setting
Infeed and buffer Manual load, 12-module accumulation 2.2 kW Buffer absorbs furnace stops
Frame remover Cuts corner keys, draws the extrusion off 5.5 kW Draw force 4–6 kN
Glass separator Single suction head lifts the front glass 7.5 kW 96–99 % glass recovery
Tunnel furnace Burns residual encapsulant from the cell sheet 15 kW + burner 6 m heated, 20–25 min dwell
Cell mill Cuts strings, mills to a 3 mm screen 11 kW Screen wear checked weekly
Off-gas train Cyclone, afterburner, bag filter 4 kW Afterburner 850 °C, 2 s

The furnace is deliberately short — six metres of heated length against twelve on the three-position line — because at this throughput the belt can dwell for twenty minutes without the line stopping. Batch running also lets the afterburner start with the furnace rather than holding temperature all day, and that is where most of the gas saving sits at this scale.

Footprint, power supply and extraction

Eleven by five metres covers the line from infeed to mill. Add 40 m² of covered feed staging and 25 m² of output bays. The furnace needs 6 m of clear height for the off-gas duct, and the duct should leave through the roof rather than a wall: a horizontal run over four metres collects condensate and drips it back onto the charge.

Service Requirement Note
Electrical 45 kW installed, 63 kVA supply Furnace and mill start in sequence
Gas 6–10 m³/h natural gas LPG at 2.5–4 kg/h as an alternative
Compressed air 6 bar, 0.3 m³/min Cylinders and dust-valve actuation
Water None in process Washdown tap only
Stack 4 m above ridge Sample port at 1.5 m

Consumables and running cost

Gas is the dominant variable cost and it tracks the encapsulant load, not the module count: factory scrap with an intact EVA layer burns longer than field panels whose bond has already chalked. Budget the upper half of the range for the first year and expect it to fall as the feed mix settles.

Item Value Basis
Gas 16–24 m³/t Higher per tonne than a large line
Electrical energy 22–32 kWh/t Mill and dust extraction dominate
Labour 2 per shift One frame and glass, one mill and packing
Wear parts Knives 400–600 h, screen 250–400 h Hardfaced, resharpened locally
Bag filter 700–1,400 h Sooner on dirty feed
Capital, indicative USD 150k–230k EXW, excluding civils and stack
The glass outlet decides viability at this size. One hundred and fifty modules yield roughly 2.1 t of cullet a shift. A glass processor within 150 km turns that into revenue; without one it becomes a skip, and the skip costs more than the aluminium earns.

What the buyer supplies, and the sizing traps

Scope on the buyer’s side is a level floor rated for 3 t/m², a 63 kVA supply, the gas connection and meter, the stack and its permit, a 2.5 t forklift, and two operators who can read a temperature trend. Commissioning takes five to seven days with the furnace brick dry-out included, and the dry-out curve cannot be shortened without cracking the lining.

The first trap is buying on module count. A shift of 150 thin 60-cell modules weighs about 2.7 t; the same count of 72-cell utility modules weighs 4.2 t, and the mill, the dust system and the gas bill all follow the tonnage. Quote the line on kilograms per hour and convert at the buyer’s own module mix.

The second trap is expecting the furnace to make up in temperature what it lacks in length. Dwell time is what removes the encapsulant; raising the set point only oxidises the cells and shortens lining life. If the feed needs a longer dwell, the belt slows and the shift count falls — which is the honest limit of this size, and the reason the next step up is the 300-module line.

MSK Machinery quotes this size against a feed sample and ships it as one 40 ft container with the furnace skid separate. The line is built by Henan MSK Machinery Co., Ltd. of Xingyang, Zhengzhou, Henan, and the trading entity behind the Alibaba storefront at https://sinoqtech.en.alibaba.com/ can be matched to the same registration on request.

Related pages

MSK network

Aggregates and mining equipment: mskmachinery.com. Export contracts: Sino Qtech Industries.

Manufacturer and compliance facts

Henan MSK Machinery Co., Ltd. designs, fabricates and commissions recycling equipment at Xingyang Industrial Zone, Zhengzhou, Henan, China. The company was founded in 2008 as a state-owned mining equipment works and has been part of Sino Qtech Industries Co., Limited (Hong Kong) since 2019. Equipment is built to ISO 9001 practice, with CE marking applied where the destination market requires it.

Legal entityHenan MSK Machinery Co., Ltd.
WorksXingyang Industrial Zone, Zhengzhou, Henan 450100, CN
Second siteGongyi — castings, wear parts, heat treatment
Export contractorSino Qtech Industries Co., Limited, Hong Kong
Quality systemISO 9001 practice; CE on request
Contact+86 133 5377 2661 · [email protected]

References used in this page’s engineering claims: EU WEEE Directive 2012/19/EU · Basel Convention on waste shipments · US DOE — Waste Reduction & Recycling · ISO 9001 quality management

Questions buyers ask before the proposal

How many modules fit in one shift at 150 per shift rating?

Between 120 and 150 framed modules in eight hours, which is 2.7–4.2 t depending on module mass. Frameless laminate runs 20–30 % faster because the frame station is skipped.

What supply does a 45 kW line need?

45 kW installed and a 63 kVA transformer. The furnace and the mill are started in sequence so the site never sees both at full load at once.

Can 1 operator run the 150-module line?

No. 2 is the minimum: one at the frame and glass stations, one at the mill and output bays. A single operator works only when the furnace is idle and the line is running mechanical separation alone.