Xingyang Industrial Zone, Zhengzhou, Henan, China

500 Modules per Shift PV Recycling Line

Five hundred modules a shift is the awkward middle of the PV recycling range: too much work for one frame station, not enough to justify three. The answer is two frame stations feeding a single furnace through a merge table, which keeps the equipment count low and puts the money where it earns — in the furnace and the mill.

450–500Modules per 8 h shift
≈1.3 t/hAverage feed
72–88 kWInstalled power
24 × 7 mLine footprint

Feed quality is the first constraint

This size is usually fed from several small collection points rather than one site, so the mix is wider than on a campaign line: domestic 60-cell panels, commercial 72-cell panels, and the occasional frameless thin-film module that someone dropped into the same stillage. Sorting at the gate costs one person an hour a day and saves far more than that in stoppages.

Feed property Accepted range Why it matters here
Module size 0.9–2.4 m × 0.8–1.2 m Two clamp sizes cover the spread
Module mass 14–32 kg Shift count converted to tonnage
Frame type Aluminium, anodised or mill finish Steel frames rejected at the gate
Glass Tempered 3.2 mm, intact Broken glass loses the cullet grade
Contamination No concrete ballast, no steel rail Stops the mill and damages the screen

Thin-film and frameless laminate can be run, but they should be campaigned rather than mixed in: they change the furnace dwell and they produce no frame fraction, so the output accounting has to be re-based for the shift.

Two frame stations, one furnace

Station Function Power Key setting
Infeed conveyor Single load point, 20-module accumulation 3 kW Variable speed, 0–8 m/min
Frame remover (×2) Corner cut and draw, parallel stations 15 kW total Draw force 4–6 kN each
Merge table Combines both streams into one lane 1.5 kW Photocell pacing
Glass separator Single head, 45 modules/h 11 kW 96–99 % glass recovery
Tunnel furnace Encapsulant burn-off, mesh belt 30 kW + burner 9 m heated, 18–22 min dwell
Cell mill String cutting, milling, sieving 16 kW 3 mm screen, 88–94 % Ag to concentrate
Off-gas train Cyclone, afterburner, bag filter 8 kW 850 °C, 2 s residence

The merge table is the part that decides whether the line runs at rating. Two frame stations rarely finish modules at the same instant, and without accumulation the glass head waits on one lane while the other backs up. Twenty modules of buffer is enough to smooth a normal shift; removing it to save floor space is the most common self-inflicted bottleneck on this size.

Building, services and clearances

The line occupies 24 × 7 m, but the working envelope is wider: 1.2 m of access on the operator side of the furnace, 2 m at the mill for screen changes, and a 3 m turning circle at the discharge end for the forklift. A 7 m clear height is needed where the off-gas duct leaves the furnace hood.

Service Requirement Note
Electrical 88 kW installed, 125 kVA supply Two frame stations do not start together
Gas 10–16 m³/h LPG 4–6.5 kg/h alternative
Compressed air 6 bar, 0.6 m³/min Two frame stations plus dust valves
Water Washdown only No process water
Floor loading 3 t/m² Furnace skid on its own pad
Stack 5 m above ridge Sample port and access platform

Operating cost at 1.3 t/h

Labour is four per shift: two on frames and glass, one on the furnace and mill, one on output grading and dispatch. Gas per tonne sits below the 300-module line because the longer furnace recovers more of its own heat through the preheat section, but it stays above what the three-position line achieves at 3.2 t/h.

Item Value Basis
Feed per shift 500 modules ≈ 10.5 t Mixed 60- and 72-cell
Gas 14–22 m³/t Tracks encapsulant load
Electrical energy 19–28 kWh/t Excludes furnace fuel
Metal loss Frame and copper at 1–2 % Mostly handling damage
Crew 4 per shift Plus one for loading
Capital, indicative USD 340k–480k EXW, excluding civils and stack
Check the mill against the peak, not the average. Frame and glass stations release modules in bursts, so the mill sees 2.5 t/h for ten minutes and then nothing. A mill sized at exactly 1.3 t/h will choke and trip; the quotation should state a peak figure and the buffer volume assumed.

Buyer scope, and the two choices that move the price

The buyer provides the building, the 125 kVA supply, gas and air connections, the stack and its permit, a 3 t forklift, and the output bays. Installation and commissioning run eight to ten days including furnace dry-out and a two-day performance run on the buyer’s own feed.

The first choice is frame-station count. Two stations at 7.5 kW are cheaper than one heavy station with a fast draw, and they degrade more gracefully — a single station failure halves output instead of stopping it. The second is whether to add a baler: at 500 modules a shift the aluminium frame fraction is 1.1–1.4 t, and loose extrusion fills a container badly.

Above roughly 550 modules a shift the single furnace becomes the limit and the sensible step is the 1,000-module line, which runs two glass heads and a 12 m furnace. Below 400, the single-position line does the same work with less capital and one fewer operator.

MSK Machinery builds this configuration as a standard skid set rather than a one-off. The equipment is manufactured by Henan MSK Machinery Co., Ltd. of Xingyang, Zhengzhou, Henan, and buyers who need to verify the trading entity can do so through https://sinoqtech.en.alibaba.com/ before issuing a letter of credit.

Related pages

MSK network

Aggregates and mining equipment: mskmachinery.com. Export contracts: Sino Qtech Industries.

Manufacturer and compliance facts

Henan MSK Machinery Co., Ltd. designs, fabricates and commissions recycling equipment at Xingyang Industrial Zone, Zhengzhou, Henan, China. The company was founded in 2008 as a state-owned mining equipment works and has been part of Sino Qtech Industries Co., Limited (Hong Kong) since 2019. Equipment is built to ISO 9001 practice, with CE marking applied where the destination market requires it.

Legal entityHenan MSK Machinery Co., Ltd.
WorksXingyang Industrial Zone, Zhengzhou, Henan 450100, CN
Second siteGongyi — castings, wear parts, heat treatment
Export contractorSino Qtech Industries Co., Limited, Hong Kong
Quality systemISO 9001 practice; CE on request
Contact+86 133 5377 2661 · [email protected]

References used in this page’s engineering claims: EU WEEE Directive 2012/19/EU · Basel Convention on waste shipments · US DOE — Waste Reduction & Recycling · ISO 9001 quality management

Questions buyers ask before the proposal

How much feed does 500 modules per shift represent?

About 10.5 t for a mixed 60- and 72-cell stream, or 1.3 t/h across an eight-hour shift. All-72-cell feed at 28 kg per module pushes the same count to 14 t.

Why 2 frame stations instead of 1 faster unit?

A single heavy station needs a 12 kN draw and still caps near 45 modules an hour. Two standard stations reach 70 an hour, and losing one costs half the output rather than all of it.

What dwell does the 9 m furnace run?

18–22 minutes over 9 m of heated length, which holds metal temperature below the 560 °C alarm. Shortening dwell to raise throughput leaves encapsulant on the cells.

Tell us the material and the tonnage

We size the line from your feed analysis, not from a catalogue page — proposal and layout within one working week.