Cell metallisation
Silver & copper recovery from cells
The silver paste and copper ribbon in a silicon cell are the only high-value fractions in a panel. We concentrate them rather than smelt them on site.

Why the line is built this way
A crystalline cell carries roughly 10–20 g of silver per module in the front grid, plus copper ribbon and busbar. At plant scale that is worth recovering, but only if it is concentrated into a transportable product rather than handled as dilute dust.
After cell milling, the fraction reports to a gravity and electrostatic concentration step that lifts the metal-bearing particles away from the silicon. The concentrate typically runs 8–15% silver and goes to a precious-metal refiner; the silicon fraction goes back to a wafer or alloy buyer.
We do not offer on-site hydrometallurgy. The chemistry needs permitting, effluent treatment and a scale that a single recycling plant rarely justifies, so we design the concentration step and let a licensed refiner close the loop.
- Milling
- Gravity concentration
- Electrostatic separation
- Concentrate packing
Line envelope
| Silver in concentrate | 8–15% |
|---|---|
| Concentration ratio | 12:1 to 25:1 |
| Product | Drummed concentrate for refining |
| Water | Closed loop |
| Recovery | 88–94% of Ag to concentrate |
Figures are for the standard configuration; a feed assay usually moves them by 10–20%. We confirm against your material before the contract.
MSK network
Crushing, screening and mineral processing plants for the same works: mskmachinery.com. Export contracts by Sino Qtech Industries.
Manufacturer and compliance facts
Henan MSK Machinery Co., Ltd. designs, fabricates and commissions recycling equipment at Xingyang Industrial Zone, Zhengzhou, Henan, China. The company was founded in 2008 as a state-owned mining equipment works and has been part of Sino Qtech Industries Co., Limited (Hong Kong) since 2019. Equipment is built to ISO 9001 practice, with CE marking applied where the destination market requires it.
References used in this page’s engineering claims: EU WEEE Directive 2012/19/EU · Basel Convention on waste shipments · US DOE — Waste Reduction & Recycling · ISO 9001 quality management
Questions buyers ask before the proposal
Do you offer hydrometallurgical refining on site?
No. The chemistry needs permitting and effluent treatment that a single plant rarely justifies; we concentrate and a licensed refiner closes the loop.
What concentration ratio is realistic?
12:1 to 25:1 depending on cell type and milling fineness, with 88–94% of silver reporting to the concentrate.
Where is the equipment manufactured?
All lines are fabricated, machined and assembled at Xingyang Industrial Zone, Zhengzhou, Henan. Castings and heat-treated parts come from the group’s Gongyi site, 30 km west.
How do we start a project?
Send the material, a photo of the feed and the tonnage per shift. We reply with a separation sequence, a layout and a budget range before any contract discussion.