Xingyang Industrial Zone, Zhengzhou, Henan, China

1,000 Modules per Shift PV Recycling Line

Three positions in parallel, one continuous furnace, and a layout that keeps the dust and the heat away from the operators. This is the size a decommissioning contractor or a utility needs when a single site hands over 20,000 panels in one campaign.

900–1,500Modules per shift
≈3.2 t/hAverage feed
95–110 kWInstalled power
34 × 9 mLine footprint

Configuration

Station Number Power each Notes
Frame remover 3 in parallel 7.5 kW Shared infeed conveyor, individual discharge
Glass separator 2 11 kW One per two frame positions
Tunnel furnace 1 continuous, 3-zone 48 kW + burner Mesh belt, 12 m heated length
Cell milling 1 30 kW Sized for peak, not average, cell flow
Off-gas train Cyclone + afterburner + bag filter 12 kW Redundant filter modules

Where the three-position line changes the engineering

Heat load. A continuous furnace processing 3 t/h of laminate releases the encapsulant as a concentrated organic load. The afterburner must be sized for the peak, which occurs when a batch of newer panels is fed; undersizing it is the most common cause of a failed stack test on this class of line. We quote the afterburner on the worst 15-minute window, not the daily average.

Dust. Milling 1%of 3 t/h means 30 kg/h of fine silicon-bearing dust, and it is both a health hazard and a fire risk. The line is laid out with the mill in a separate compartment under negative pressure, a bag filter on the mill discharge and a water mist on the transfer points.

Buffer. At this throughput a frame remover stoppage of ten minutes starves the furnace, which then has to be idled and re-stabilised. A 40-module buffer table between frame removal and glass separation costs about USD 9k and keeps the furnace at temperature through short stops.

Economics at this scale

Item Value Basis
Feed per shift 1,000 modules ≈ 21 t Mixed 60- and 72-cell modules
Glass output 14–15 t 68–72 % of mass, cullet grade
Aluminium output 2.1–2.7 t Clean extrusion, no laminate attached
Energy per tonne 18–26 kWh Excludes furnace fuel
Gas per tonne 12–20 m³ Depends on encapsulant load
Crew 6–7 per shift Two on furnace and mill
Capital, indicative USD 520k–760k EXW, excluding civils
Plan the glass outlet first. At 1,000 modules per shift the line produces 15 tonnes of cullet a day — 4,000 tonnes a year. Without a glass buyer within economic haul distance the plant stores it, and storage is what closes PV recycling sites. Confirm the outlet before confirming the line.

Related pages

MSK network

Aggregates and mining equipment: mskmachinery.com. Export contracts: Sino Qtech Industries.

Manufacturer and compliance facts

Henan MSK Machinery Co., Ltd. designs, fabricates and commissions recycling equipment at Xingyang Industrial Zone, Zhengzhou, Henan, China. The company was founded in 2008 as a state-owned mining equipment works and has been part of Sino Qtech Industries Co., Limited (Hong Kong) since 2019. Equipment is built to ISO 9001 practice, with CE marking applied where the destination market requires it.

Legal entityHenan MSK Machinery Co., Ltd.
WorksXingyang Industrial Zone, Zhengzhou, Henan 450100, CN
Second siteGongyi — castings, wear parts, heat treatment
Export contractorSino Qtech Industries Co., Limited, Hong Kong
Quality systemISO 9001 practice; CE on request
Contact+86 133 5377 2661 · [email protected]

References used in this page’s engineering claims: EU WEEE Directive 2012/19/EU · Basel Convention on waste shipments · US DOE — Waste Reduction & Recycling · ISO 9001 quality management

Questions buyers ask before the proposal

How many panels can the furnace take per hour?

Roughly 130 modules per hour at a 12 m heated length and 25 minutes dwell. Frame removal runs at 160 per hour, which is why three positions are needed to keep the furnace fed.

Is one furnace enough for 1,500 modules per shift?

For most feeds yes, with the buffer table absorbing peaks. Above 1,500 modules the second furnace is cheaper than running the first one hotter, because dwell time cannot be shortened without losing glass quality.

What footprint should be planned?

34 × 9 m for the line itself, plus 60 m² of feed staging and 120 m² of output storage. A 6 m clear height is needed over the furnace for the off-gas duct.

Tell us the material and the tonnage

We size the line from your feed analysis, not from a catalogue page — proposal and layout within one working week.