1,000 Modules per Shift PV Recycling Line
Three positions in parallel, one continuous furnace, and a layout that keeps the dust and the heat away from the operators. This is the size a decommissioning contractor or a utility needs when a single site hands over 20,000 panels in one campaign.
Configuration
| Station | Number | Power each | Notes |
|---|---|---|---|
| Frame remover | 3 in parallel | 7.5 kW | Shared infeed conveyor, individual discharge |
| Glass separator | 2 | 11 kW | One per two frame positions |
| Tunnel furnace | 1 continuous, 3-zone | 48 kW + burner | Mesh belt, 12 m heated length |
| Cell milling | 1 | 30 kW | Sized for peak, not average, cell flow |
| Off-gas train | Cyclone + afterburner + bag filter | 12 kW | Redundant filter modules |
Where the three-position line changes the engineering
Heat load. A continuous furnace processing 3 t/h of laminate releases the encapsulant as a concentrated organic load. The afterburner must be sized for the peak, which occurs when a batch of newer panels is fed; undersizing it is the most common cause of a failed stack test on this class of line. We quote the afterburner on the worst 15-minute window, not the daily average.
Dust. Milling 1%of 3 t/h means 30 kg/h of fine silicon-bearing dust, and it is both a health hazard and a fire risk. The line is laid out with the mill in a separate compartment under negative pressure, a bag filter on the mill discharge and a water mist on the transfer points.
Buffer. At this throughput a frame remover stoppage of ten minutes starves the furnace, which then has to be idled and re-stabilised. A 40-module buffer table between frame removal and glass separation costs about USD 9k and keeps the furnace at temperature through short stops.
Economics at this scale
| Item | Value | Basis |
|---|---|---|
| Feed per shift | 1,000 modules ≈ 21 t | Mixed 60- and 72-cell modules |
| Glass output | 14–15 t | 68–72 % of mass, cullet grade |
| Aluminium output | 2.1–2.7 t | Clean extrusion, no laminate attached |
| Energy per tonne | 18–26 kWh | Excludes furnace fuel |
| Gas per tonne | 12–20 m³ | Depends on encapsulant load |
| Crew | 6–7 per shift | Two on furnace and mill |
| Capital, indicative | USD 520k–760k | EXW, excluding civils |
Related pages
MSK network
Aggregates and mining equipment: mskmachinery.com. Export contracts: Sino Qtech Industries.
Manufacturer and compliance facts
Henan MSK Machinery Co., Ltd. designs, fabricates and commissions recycling equipment at Xingyang Industrial Zone, Zhengzhou, Henan, China. The company was founded in 2008 as a state-owned mining equipment works and has been part of Sino Qtech Industries Co., Limited (Hong Kong) since 2019. Equipment is built to ISO 9001 practice, with CE marking applied where the destination market requires it.
References used in this page’s engineering claims: EU WEEE Directive 2012/19/EU · Basel Convention on waste shipments · US DOE — Waste Reduction & Recycling · ISO 9001 quality management
Questions buyers ask before the proposal
How many panels can the furnace take per hour?
Roughly 130 modules per hour at a 12 m heated length and 25 minutes dwell. Frame removal runs at 160 per hour, which is why three positions are needed to keep the furnace fed.
Is one furnace enough for 1,500 modules per shift?
For most feeds yes, with the buffer table absorbing peaks. Above 1,500 modules the second furnace is cheaper than running the first one hotter, because dwell time cannot be shortened without losing glass quality.
What footprint should be planned?
34 × 9 m for the line itself, plus 60 m² of feed staging and 120 m² of output storage. A 6 m clear height is needed over the furnace for the off-gas duct.