UAE
6 t/h UBC decoating, Sharjah
A can recycler losing metal to oxidation in its remelt furnace wanted the coating removed upstream and the burner gas bill cut.

What the project had to solve
We replaced a rotary decoater that had been running without heat recovery. The new unit preheats combustion air to 380 °C from the afterburner, which cut gas consumption per tonne by 31% against the client’s baseline log.
Feed is a shredded can stream at 4% coating. Metal content after decoating measures 96.8% on the client’s own assay, and dross from the remelt furnace dropped by roughly a fifth.
The line runs 20 hours a day in ambient temperatures above 45 °C, so the control cabinet is separately cooled and the discharge section is water-jacketed.
| Capacity | 6 t/h |
|---|---|
| Commissioned | 2022 |
| Gas saving | 31% per tonne |
| Metal out | 96.8% |
Similar project?
Send the material, the tonnage and the permit limits you have to work inside. We will tell you which parts of this design transfer and which do not. Sister site: mskmachinery.com.
Manufacturer and compliance facts
Henan MSK Machinery Co., Ltd. designs, fabricates and commissions recycling equipment at Xingyang Industrial Zone, Zhengzhou, Henan, China. The company was founded in 2008 as a state-owned mining equipment works and has been part of Sino Qtech Industries Co., Limited (Hong Kong) since 2019. Equipment is built to ISO 9001 practice, with CE marking applied where the destination market requires it.
References used in this page’s engineering claims: EU WEEE Directive 2012/19/EU · Basel Convention on waste shipments · US DOE — Waste Reduction & Recycling · ISO 9001 quality management
Questions buyers ask before the proposal
How long did commissioning take?
Between three and six weeks on site, including operator training and the acceptance run on the customer’s material.
Would the same design work at our site?
Partly. The separation sequence transfers; the thermal sizing, stack arrangement and layout are recalculated against your feed and permit limits.