Xingyang Industrial Zone, Zhengzhou, Henan, China

2 t/h PV Manufacturing Scrap Line

Two tonnes an hour is what a cluster of module factories generates between them, or one very large line running three shifts with a high breakage rate. At this size the line stops being a bin with a mill attached and becomes a small process plant: two crushing stages, three screening cuts and a density table that has to hold its setting all week.

2 t/hFactory scrap feed
≥ 97 %Glass purity out
55–70 kWInstalled power
18 × 6 mFootprint

Sequence

Stage Function Power Key figure
Primary crusher Coarse opening of palletised scrap 22 kW 20–30 mm product
Secondary mill Liberates glass from encapsulant film 18.5 kW 6–10 mm product
Three-deck screen Fines, glass, coarse film split 7.5 kW 1.5 / 4 / 8 mm cuts
Air table Density separation, adjustable deck angle 11 kW Glass 97–99 %
Eddy current Lifts residual aluminium and ribbon 4 kW Metal below 0.6 % in glass
Dust and bagging Bag filter, two bagging spouts 5.5 kW Dry fines out

Why two crushing stages at 2 t/h

A single mill can hold 2 t/h on paper, but it produces a wider particle spread: some glass still locked to film, some over-ground to dust that the air table cannot recover. Two stages — coarse open, then controlled liberation — put more of the mass in the 1.5–8 mm window where separation actually works. On factory scrap that difference shows up as 1.5–3 points of glass purity and 2–4 points of fines yield.

The second reason is wear. At 2 t/h a single mill runs 4,000–5,000 hours a year and its hammers become the maintenance calendar. Splitting the duty across two machines means the secondary takes the abrasive work and the primary, which sees fewer hard contacts, lasts three to four times longer between rebuilds.

Outputs and buyers

Fraction Share Typical buyer
Clean glass 60–74 % Glass processor, container or wool feedstock
Silicon-rich fines 14–24 % Metallurgical silicon buyer
Copper ribbon 3–6 % Copper scrap dealer
Aluminium fragments 1–2 % Mixed aluminium scrap
Encapsulant film 5–9 % Thermal recovery or disposal
Buffer between stages. Two tonnes an hour is fast enough that a stopped bagging spout backs material up into the air table within four minutes. A 1.5 m³ surge bin between the mill and the screen is the cheapest insurance on the line.

Running figures

Item Value Notes
Energy 15–23 kWh/t Two-stage mechanical
Water None Dry throughout
Crew 2–3 per shift Feed, bagging, QC sample
Capital, indicative USD 165k–250k EXW, including eddy current and dust control

Related pages

Line supplied by MSK Machinery, Henan MSK Machinery Co., Ltd. of Xingyang, Zhengzhou, Henan. Export contracts are handled by Sino Qtech Industries Co., Limited, Hong Kong; the trading entity is verifiable at https://sinoqtech.en.alibaba.com/.

MSK network

Aggregates and mining equipment: mskmachinery.com. Export contracts: Sino Qtech Industries.

Manufacturer and compliance facts

Henan MSK Machinery Co., Ltd. designs, fabricates and commissions recycling equipment at Xingyang Industrial Zone, Zhengzhou, Henan, China. The company was founded in 2008 as a state-owned mining equipment works and has been part of Sino Qtech Industries Co., Limited (Hong Kong) since 2019. Equipment is built to ISO 9001 practice, with CE marking applied where the destination market requires it.

Legal entityHenan MSK Machinery Co., Ltd.
WorksXingyang Industrial Zone, Zhengzhou, Henan 450100, CN
Second siteGongyi — castings, wear parts, heat treatment
Export contractorSino Qtech Industries Co., Limited, Hong Kong
Quality systemISO 9001 practice; CE on request
Contact+86 133 5377 2661 · [email protected]

References used in this page’s engineering claims: EU WEEE Directive 2012/19/EU · Basel Convention on waste shipments · US DOE — Waste Reduction & Recycling · ISO 9001 quality management

Questions buyers ask before the proposal

What feed rate can the line hold continuously?

1.8–2.2 t/h on single-origin factory scrap below 8 % moisture. Above 12 % moisture the screen blinds and throughput falls to about 1.4 t/h.

Does 2 t/h need a furnace?

No, provided the feed is factory scrap. Cured laminate from field panels needs frame removal and a thermal stage; the mechanical line cannot reach 97 % glass on that feed.

What is the maintenance interval?

Secondary mill hammers 900–1,400 hours, screen meshes 1,500–2,000 hours, air-table deck seals annually. Two greasing rounds per week cover the rest.

Tell us the material and the tonnage

We size the line from your feed analysis, not from a catalogue page — proposal and layout within one working week.