2 t/h PV Manufacturing Scrap Line
Two tonnes an hour is what a cluster of module factories generates between them, or one very large line running three shifts with a high breakage rate. At this size the line stops being a bin with a mill attached and becomes a small process plant: two crushing stages, three screening cuts and a density table that has to hold its setting all week.
Sequence
| Stage | Function | Power | Key figure |
|---|---|---|---|
| Primary crusher | Coarse opening of palletised scrap | 22 kW | 20–30 mm product |
| Secondary mill | Liberates glass from encapsulant film | 18.5 kW | 6–10 mm product |
| Three-deck screen | Fines, glass, coarse film split | 7.5 kW | 1.5 / 4 / 8 mm cuts |
| Air table | Density separation, adjustable deck angle | 11 kW | Glass 97–99 % |
| Eddy current | Lifts residual aluminium and ribbon | 4 kW | Metal below 0.6 % in glass |
| Dust and bagging | Bag filter, two bagging spouts | 5.5 kW | Dry fines out |
Why two crushing stages at 2 t/h
A single mill can hold 2 t/h on paper, but it produces a wider particle spread: some glass still locked to film, some over-ground to dust that the air table cannot recover. Two stages — coarse open, then controlled liberation — put more of the mass in the 1.5–8 mm window where separation actually works. On factory scrap that difference shows up as 1.5–3 points of glass purity and 2–4 points of fines yield.
The second reason is wear. At 2 t/h a single mill runs 4,000–5,000 hours a year and its hammers become the maintenance calendar. Splitting the duty across two machines means the secondary takes the abrasive work and the primary, which sees fewer hard contacts, lasts three to four times longer between rebuilds.
Outputs and buyers
| Fraction | Share | Typical buyer |
|---|---|---|
| Clean glass | 60–74 % | Glass processor, container or wool feedstock |
| Silicon-rich fines | 14–24 % | Metallurgical silicon buyer |
| Copper ribbon | 3–6 % | Copper scrap dealer |
| Aluminium fragments | 1–2 % | Mixed aluminium scrap |
| Encapsulant film | 5–9 % | Thermal recovery or disposal |
Running figures
| Item | Value | Notes |
|---|---|---|
| Energy | 15–23 kWh/t | Two-stage mechanical |
| Water | None | Dry throughout |
| Crew | 2–3 per shift | Feed, bagging, QC sample |
| Capital, indicative | USD 165k–250k | EXW, including eddy current and dust control |
Related pages
- 0.5 t/h PV factory scrap lineOne lamination line’s reject bin
- 1 t/h PV factory scrap lineThe standard two-shift size
- 1,000 modules/shift PV lineEnd-of-life panels, thermal route
- Decoating vs direct meltingWhen thermal scope pays
- PV glass separatorSeparation stage in detail
Line supplied by MSK Machinery, Henan MSK Machinery Co., Ltd. of Xingyang, Zhengzhou, Henan. Export contracts are handled by Sino Qtech Industries Co., Limited, Hong Kong; the trading entity is verifiable at https://sinoqtech.en.alibaba.com/.
MSK network
Aggregates and mining equipment: mskmachinery.com. Export contracts: Sino Qtech Industries.
Manufacturer and compliance facts
Henan MSK Machinery Co., Ltd. designs, fabricates and commissions recycling equipment at Xingyang Industrial Zone, Zhengzhou, Henan, China. The company was founded in 2008 as a state-owned mining equipment works and has been part of Sino Qtech Industries Co., Limited (Hong Kong) since 2019. Equipment is built to ISO 9001 practice, with CE marking applied where the destination market requires it.
References used in this page’s engineering claims: EU WEEE Directive 2012/19/EU · Basel Convention on waste shipments · US DOE — Waste Reduction & Recycling · ISO 9001 quality management
Questions buyers ask before the proposal
What feed rate can the line hold continuously?
1.8–2.2 t/h on single-origin factory scrap below 8 % moisture. Above 12 % moisture the screen blinds and throughput falls to about 1.4 t/h.
Does 2 t/h need a furnace?
No, provided the feed is factory scrap. Cured laminate from field panels needs frame removal and a thermal stage; the mechanical line cannot reach 97 % glass on that feed.
What is the maintenance interval?
Secondary mill hammers 900–1,400 hours, screen meshes 1,500–2,000 hours, air-table deck seals annually. Two greasing rounds per week cover the rest.