5 t/h Coated Aluminium Decoating Line
Five tonnes an hour is a decoater that feeds a smelter rather than a dealer. It runs architectural profile, coated sheet and foil in campaigns, five zones over twenty-four metres of heated length, and it holds metal loss low enough that the output sells close to primary grade instead of at a mixed-scrap discount.
Feed mix at five tonnes
At this rate the plant is fed by baled or loose deliveries from fabricators, window manufacturers and coil processors, and the mix changes week to week. The tunnel is programmed per campaign, and the campaign plan — not the equipment — determines how much of the nominal rating is actually used.
| Section | Share of typical feed | Rate at full dwell |
|---|---|---|
| Profile 2–4 mm | 40–55 % | 4.2–4.6 t/h |
| Sheet 0.5–1.5 mm | 25–35 % | 5.0–5.5 t/h |
| Foil 0.05–0.2 mm | 10–20 % | 6.0 t/h, belt speed limited |
| Mixed unsorted | Avoid | 3.5 t/h and poor quality |
Mixed unsorted feed is the single largest destroyer of value in a plant this size. The dwell needed for 4 mm profile scorches foil, and the operator’s usual response is to slow the belt for everything, which cuts throughput by a third. Sorting into campaigns costs a yard and a telehandler and returns far more than it costs.
Five zones over 24 m
| Zone | Set point (profile) | Function |
|---|---|---|
| Zone 1 | 470 °C | Heat-through, drives off surface moisture |
| Zone 2 | 510 °C | Film ignition, main volatile release |
| Zone 3 | 530 °C | Burn-out of the primer layer |
| Zone 4 | 520 °C | Hold, allows section core to catch up |
| Zone 5 | 480 °C | Soak and controlled cool before discharge |
The fourth zone is what distinguishes a five-zone tunnel from a three-zone one run hotter. Heavy profile arrives at zone 4 with its core still below the surface temperature; without the hold, the surface oxidises while the paint in the section root survives. The hold costs gas and saves metal, and on 4 mm profile it is the difference between 1.3 % loss and 2 %.
| Stage | Equipment | Power | Key setting |
|---|---|---|---|
| Feed | Belt loader, 1.8 m, spreader | 7.5 kW | Layer below 60 mm |
| Tunnel | Mesh belt, 5 zones, 24 m heated | 22 kW drives | Burners on zones 1–3 |
| Cooling | Forced air, 6 m, two stages | 11 kW | Below 150 °C at the baler |
| Off-gas | Cyclone, afterburner, bag filter | 22 kW | 850 °C, 2 s, continuous logging |
| Discharge | Baler, 5 t/h | 30 kW | Bale 40–60 kg |
Layout, heat recovery and the stack
Forty by nine metres, with the tunnel on a raised plinth so the baler can sit below the discharge. The building needs 9 m of clear height over zone 3 for the hood and duct, and the stack should be sized for the afterburner at peak, not average, because a stack test will be run at full rate.
| Service | Requirement | Note |
|---|---|---|
| Electrical | 120 kW installed, 160 kVA supply | Baler and off-gas fans largest |
| Gas | 55–80 m³/h at full rate | Zones plus afterburner |
| Heat recovery | 60–75 % of burner duty | Zone 1 and dryer preheat |
| Compressed air | 6 bar, 0.9 m³/min | Dampers and bag pulse |
| Water | 1 m³/day | Cooling circuit make-up |
| Stack | 6 m above ridge | Platform and sample ports |
Cost per tonne
| Item | Value | Notes |
|---|---|---|
| Gas | 28–38 m³/t | Lower than short tunnels |
| Electrical energy | 32–46 kWh/t | Fans, drives, baler |
| Metal loss | 0.7–1.3 % | Profile at the top of the range |
| Mesh belt life | 12–18 months | Longer than a short tunnel’s |
| Crew | 4 per shift | Charging, zones, discharge, yard |
| Capital, indicative | USD 620k–900k | EXW, excluding civils and stack |
Buyer scope, contract points, and what to watch
The buyer supplies the building with 9 m clearance at the hood, the plinth and foundations, the 160 kVA supply, gas at 80 m³/h peak, the stack and its permit, a 5 t forklift with a bale clamp, and the yard for campaign storage. Erection and commissioning take four to six weeks, with a five-day performance run on each section range.
Contract points to fix in writing: guaranteed metal loss per section range, the afterburner duty at peak, the stack limits the design is tested against, and the belt speed range that achieves the rated dwell. The last one is often omitted, and it is the number that decides whether five tonnes is reachable at all on heavy profile.
Two traps. The first is assuming the baler can absorb the line rate — a 5 t/h tunnel needs a baler rated above it, and a 3 t/h baler becomes the bottleneck within a week. The second is planning campaigns around alloy rather than section: both matter, but section sets the dwell and alloy sets the price, and the yard layout has to serve both.
Below about three tonnes an hour the three-zone tunnel does the same work with less capital; above five, two parallel tunnels are usually cheaper than one wider belt, because a 2.4 m belt tracks badly at temperature.
MSK Machinery supplies this tunnel with the zone programme and the campaign plan written together, since one is useless without the other. Manufacture is by Henan MSK Machinery Co., Ltd. of Xingyang, Zhengzhou, Henan, and the trading entity can be confirmed at https://sinoqtech.en.alibaba.com/ before the letter of credit is opened.
Related pages
MSK network
Aggregates and mining equipment: mskmachinery.com. Export contracts: Sino Qtech Industries.
Manufacturer and compliance facts
Henan MSK Machinery Co., Ltd. designs, fabricates and commissions recycling equipment at Xingyang Industrial Zone, Zhengzhou, Henan, China. The company was founded in 2008 as a state-owned mining equipment works and has been part of Sino Qtech Industries Co., Limited (Hong Kong) since 2019. Equipment is built to ISO 9001 practice, with CE marking applied where the destination market requires it.
References used in this page’s engineering claims: EU WEEE Directive 2012/19/EU · Basel Convention on waste shipments · US DOE — Waste Reduction & Recycling · ISO 9001 quality management
Questions buyers ask before the proposal
Why 5 zones instead of 3 at this rate?
The fourth zone holds temperature while the core of heavy profile catches up. Without it the surface oxidises before the paint in the section root burns, which costs 0.5–0.7 % of metal.
How much gas does the tunnel use per 1 t?
28–38 m³ of natural gas per tonne at full rate, against 38–52 m³ on a one-tonne short tunnel. The saving comes from 24 m of heated length and 60–75 % heat recovery.
What belt speed gives the 12–16 min dwell?
For profile at 12–16 minutes dwell, 1.5–2.0 m/min over 24 m of heated length. Foil runs at 5–6 m/min for its 4–5 minutes.