0.5 t/h Lithium Battery Sorting Line
Half a tonne an hour is the scale of a regional collection centre or a repair operator that already handles packs: enough to justify inert processing, not enough to justify a smelter relationship on its own. The line is built around that reality — a discharge stage sized for weeks of inventory, and a separation train that produces a black mass a refiner will accept in tonne lots.
What the line can safely take
Consumer cells, power-tool packs, e-bike batteries and small automotive modules up to about 40 kg. Whole vehicle packs are excluded at this size — not because the crusher could not reduce them, but because the discharge rack and the dismantling bench cannot handle the handling weight safely with three operators.
| Feed | Accepted | Handling note |
|---|---|---|
| Cylindrical cells | 18650, 21700, 26650, 32650 | Loose or in modules, terminals taped |
| Pouch cells | Up to 500 × 300 mm | Punctured pouches quarantined |
| Prismatic cells | Up to 20 kg | Discharged before opening |
| Packs and modules | Up to 40 kg | BMS removed at the bench |
| State of charge | Below 30 % on receipt | Above 30 % goes to the rack first |
| Rejected | Swollen, leaking or fire-damaged cells | Salt-water quarantine drum |
Swollen and leaking cells are the feed that starts fires in collection, not in the plant. They are separated at goods-in, held in a steel drum with a lid, and processed in a short dedicated campaign with the crusher at reduced rate.
Stations and interlocks
| Station | Function | Power | Control point |
|---|---|---|---|
| Discharge rack | Resistive discharge, voltage logged per batch | 5 kW | Cell voltage below 1.0 V |
| Inert dismantling bench | BMS, cable and casing removal under nitrogen | 9 kW | O₂ below 8 % |
| Crusher | Water-cooled reduction of cells and modules | 30 kW | Inert, temperature alarm at 60 °C |
| Density separation | Black mass, copper, aluminium, separator | 16 kW | Black mass purity ≥ 96 % |
| Magnetic and eddy stage | Steel casing and aluminium fines | 7 kW | Steel fraction below 1 % Cu |
| Off-gas and scrubber | HF and electrolyte vapour control | 8 kW | Stack monitoring |
Three interlocks are hard-wired rather than software-only: oxygen above 8 % stops the crusher, a temperature rise of 15 °C per minute stops the feed, and loss of nitrogen pressure closes the inlet guillotine. Software interlocks can be bypassed by a determined operator at three in the morning; hard-wired ones cannot.
Discharge is the real capacity limit
The crusher will take half a tonne an hour whenever it is fed. The rack will not. A pack at 60 % state of charge needs eight to fourteen hours on a resistive load, and a mixed collection contains packs at every state between empty and full. Half a tonne an hour over a single shift therefore needs a rack holding three to four days of feed, or roughly 12–16 t of inventory in racks.
That inventory is the plant’s largest fire load and the reason the rack sits in its own compartment with a deluge system and a heat detector per bay. It is also working capital: 14 t of packs is material paid for and not yet sold. Both facts belong in the business case, and neither appears in a quotation that quotes the line by the tonne per hour.
Space, nitrogen and services
Sixteen by six metres holds the rack, bench, crusher and separation skid. The rack itself is better placed in a separate bay with a two-hour fire wall, which adds 40 m² and is worth every square metre.
| Service | Requirement | Note |
|---|---|---|
| Electrical | 85 kW installed, 110 kVA supply | Crusher on a soft starter |
| Nitrogen | 18–25 Nm³/h | PSA plant or dewar supply |
| Compressed air | 6 bar, 0.8 m³/min | Dry and oil-free |
| Water | 1.5 m³/day | Crusher cooling loop |
| Ventilation | 6 air changes/h in the process room | Separate from the rack bay |
| Item | Value | Notes |
|---|---|---|
| Energy per tonne | 62–92 kWh | Higher than the 1 t/h line |
| Nitrogen per tonne | 2.2–3.2 t | Purging losses dominate at small scale |
| Black mass output | 250–350 kg/t | 125–175 kg/h at rated feed |
| Crew | 3 per shift | Two on dismantling, one control |
| Capital, indicative | USD 300k–450k | EXW, excluding civils and N₂ plant |
Buyer scope and the traps at this size
The buyer provides the building with the fire compartment, the 110 kVA supply, nitrogen storage or a PSA plant, water for the crusher loop, the scrubber discharge permit, and a 1.5 t forklift with a drum handler. Commissioning runs ten to fourteen days, including a witnessed inert-atmosphere test and a full discharge audit on the first two tonnes.
Trap one is treating the rack as an accessory. It sets the plant’s true throughput, and a rack sized for one shift turns a 0.5 t/h line into a 0.15 t/h line in practice. Trap two is buying the crusher without the scrubber: hydrogen fluoride is not visible, not smellable at low concentration, and the permit will require continuous monitoring that the scrubber exists to satisfy. Trap three is assuming black mass sells itself — at half a tonne an hour the output is 2–3 t a day, which is a lot sample to refine and a small lot to negotiate.
MSK Machinery supplies this size as a containerised skid set with the rack built locally to a supplied drawing. The equipment is produced by Henan MSK Machinery Co., Ltd. of Xingyang, Zhengzhou, Henan, and the trading identity behind https://sinoqtech.en.alibaba.com/ should be checked before any advance payment.
Related pages
MSK network
Aggregates and mining equipment: mskmachinery.com. Export contracts: Sino Qtech Industries.
Manufacturer and compliance facts
Henan MSK Machinery Co., Ltd. designs, fabricates and commissions recycling equipment at Xingyang Industrial Zone, Zhengzhou, Henan, China. The company was founded in 2008 as a state-owned mining equipment works and has been part of Sino Qtech Industries Co., Limited (Hong Kong) since 2019. Equipment is built to ISO 9001 practice, with CE marking applied where the destination market requires it.
References used in this page’s engineering claims: EU WEEE Directive 2012/19/EU · Basel Convention on waste shipments · US DOE — Waste Reduction & Recycling · ISO 9001 quality management
Questions buyers ask before the proposal
How long does a 60 % pack take to discharge?
Eight to fourteen hours at 60 % state of charge on a resistive rack, and two to four hours from 20 %. The rack is sized on days of inventory, not on the hourly feed rate.
What nitrogen use should I budget per 1 t?
2.2–3.2 t per tonne of feed, which is 18–25 Nm³/h at rated capacity. Purging between batches is the largest component at this size.
How much black mass comes out of 1 shift?
At 0.5 t/h and 250–350 kg per tonne, a full shift produces 1.0–1.4 t. That is enough for a refiner to assay properly and small enough to need a consolidation agreement.