Xingyang Industrial Zone, Zhengzhou, Henan, China

3 t/h Coated Aluminium Decoater

Painted extrusion, coated sheet and printed foil are not cans. The paint film is thicker, the sections are heavier, and the alloys are often specified separately — so the decoater runs on zones with individual set points rather than one burner and a drum.

3 t/hCoated feed
< 1.5 %Metal loss
3 zonesIndependent control
Foil–4 mmSection range

Zone settings by section

Section Zone 1 Zone 2 Zone 3 Dwell
Foil 0.05–0.2 mm 420 °C 460 °C 430 °C 3–4 min
Sheet 0.5–1.5 mm 450 °C 500 °C 460 °C 6–8 min
Profile 2–4 mm 480 °C 520 °C 470 °C 10–14 min

The third zone matters more than its temperature suggests: it is a soak, not a burn. Running it hot drives surface oxidation and turns a bright charge into a dull one that a remelt furnace discounts. Running it cold leaves carbon on the surface, which produces smoke in the customer’s furnace — the same complaint as under-decoated cans.

Layout

Stage Equipment Power Note
Feed Belt loader with spreader 4 kW Single layer — stacked charge decoats unevenly
Tunnel Mesh belt, 3 zones, 14 m heated 12 kW drives Burners on each zone
Cooling Forced air section, 4 m 7.5 kW Discharge below 150 °C
Off-gas Cyclone, afterburner, bag filter 11 kW Afterburner at 850 °C, 2 s
Discharge Baler or direct to bin 15 kW Baled charge loads a furnace faster

Why single-layer charging is not negotiable

A bed three sections deep decoats from the outside in: the top and bottom burn clean while the middle comes out with paint intact, and the operator compensates by raising the temperature, which oxidises the clean surfaces. The result is a batch that is both over-burnt and under-decoated — the worst of both. The spreader is what keeps the line honest, and it is the part buyers most often ask to delete to save USD 6k.

Operating figures

Item Value Notes
Gas 32–45 m³/t Higher than cans because of section mass
Heat recovery 55–70 % of burner duty Preheat zone 1 combustion air
Metal loss 0.8–1.5 % Foil at the top of the range
Crew 3 per shift One on zone control and off-gas
Capital, indicative USD 295k–430k EXW, excluding civils and stack
Alloy separation: a tunnel decoater runs one alloy at a time if the output is to be sold as a grade. Plan a two-bin discharge and a purge cycle of 6–8 minutes; mixing 6063 and 3003 in one bale turns both into a lower-priced mixed scrap.

Related pages

MSK network

Aggregates and mining equipment: mskmachinery.com. Export contracts: Sino Qtech Industries.

Manufacturer and compliance facts

Henan MSK Machinery Co., Ltd. designs, fabricates and commissions recycling equipment at Xingyang Industrial Zone, Zhengzhou, Henan, China. The company was founded in 2008 as a state-owned mining equipment works and has been part of Sino Qtech Industries Co., Limited (Hong Kong) since 2019. Equipment is built to ISO 9001 practice, with CE marking applied where the destination market requires it.

Legal entityHenan MSK Machinery Co., Ltd.
WorksXingyang Industrial Zone, Zhengzhou, Henan 450100, CN
Second siteGongyi — castings, wear parts, heat treatment
Export contractorSino Qtech Industries Co., Limited, Hong Kong
Quality systemISO 9001 practice; CE on request
Contact+86 133 5377 2661 · [email protected]

References used in this page’s engineering claims: EU WEEE Directive 2012/19/EU · Basel Convention on waste shipments · US DOE — Waste Reduction & Recycling · ISO 9001 quality management

Questions buyers ask before the proposal

Can the same tunnel handle cans and profile?

In campaigns, with a zone-programme change and a purge. The mesh belt and the spreader suit profile better; cans run more evenly in a rotary drum, which is why the two duties usually get separate machines.

What happens to the paint residue?

It burns in the tunnel and the products of combustion pass through the afterburner at 850 °C for two seconds, then a bag filter. Ash is collected at the cyclone.

Is the output saleable as a premium grade?

Yes if the alloy is kept separate and metal loss stays under 1.5 %. Bright, paint-free 6063 typically sells at a small discount to primary, not at mixed-scrap prices.

Tell us the material and the tonnage

We size the line from your feed analysis, not from a catalogue page — proposal and layout within one working week.