Xingyang Industrial Zone, Zhengzhou, Henan, China

2 t/h UBC Decoated Aluminium Line

Two tonnes an hour is the size that matches a regional can collection point: enough to justify a burner, an afterburner and a heat-recovery train, small enough to fit under an existing roof. It takes baled or loose UBC, and delivers a furnace-ready charge above 96 % metal with the paint gone.

2 t/hCoated can feed
480–520 °CDecoating temperature
≥ 96 %Metal content out
75–90 kWInstalled power

Line sequence

Stage Function Power Key setting
Bale breaker / shredder Opens bales, shreds to 30–60 mm flake 45 kW Flake size sets decoating time
Dryer Removes surface moisture and free liquid 11 kW Feed below 2 % moisture
Rotary decoater Low-oxygen burn-off of lacquer and paint 7.5 kW drive + burner 480–520 °C, 4–7 min dwell
Afterburner Oxidises volatiles before the stack 5.5 kW Sized on peak volatile load
Cooling and discharge Indirect cooling, dust extraction 6 kW Discharge below 120 °C

Why the metal temperature ceiling matters more than throughput

Aluminium melts at 660 °C, and a decoater that overshoots does not fail loudly — it produces a sticky, partially melted charge that welds itself to the flight and the discharge chute. The line holds a 560 °C alarm and a 580 °C burner cut-out, and the control loop reads flake-bed temperature rather than gas temperature, because the two differ by 60–90 °C in a rotary drum.

Staying below the ceiling is what sets the dwell time, and dwell time sets throughput for a given drum volume. That is why a 2 t/h line and a 4 t/h line are not the same machine run faster: the larger unit has a longer drum and a bigger burner, and the afterburner grows with it. Buying a 2 t/h unit and pushing 3 t/h produces under-decoated metal that smokes in the customer’s furnace — a complaint that ends contracts faster than any price difference.

Operating figures

Item Value Notes
Gas consumption 28–38 m³/t Natural gas; LPG at 11–15 kg/t
Heat recovery 60–75 % of burner duty Preheats combustion air and dryer
Metal loss 1.0–1.8 % Oxidation and fines; rises with dirty feed
Organics removed 3–5 % of feed mass Paint, lacquer, residual beverage
Crew 3 per shift One on the burner and controls
Capital, indicative USD 380k–540k EXW, excluding civils and stack
Compare on metal loss, not on price. A line at 1 % loss on 2 t/h returns 20 kg more metal per hour than one at 2 % — around 100 tonnes a year at two shifts. That difference exceeds the price gap between most competing quotations.

Related pages

MSK network

Aggregates and mining equipment: mskmachinery.com. Export contracts: Sino Qtech Industries.

Manufacturer and compliance facts

Henan MSK Machinery Co., Ltd. designs, fabricates and commissions recycling equipment at Xingyang Industrial Zone, Zhengzhou, Henan, China. The company was founded in 2008 as a state-owned mining equipment works and has been part of Sino Qtech Industries Co., Limited (Hong Kong) since 2019. Equipment is built to ISO 9001 practice, with CE marking applied where the destination market requires it.

Legal entityHenan MSK Machinery Co., Ltd.
WorksXingyang Industrial Zone, Zhengzhou, Henan 450100, CN
Second siteGongyi — castings, wear parts, heat treatment
Export contractorSino Qtech Industries Co., Limited, Hong Kong
Quality systemISO 9001 practice; CE on request
Contact+86 133 5377 2661 · [email protected]

References used in this page’s engineering claims: EU WEEE Directive 2012/19/EU · Basel Convention on waste shipments · US DOE — Waste Reduction & Recycling · ISO 9001 quality management

Questions buyers ask before the proposal

What feed specification does the line need?

Baled or loose UBC, free of steel and PET, below 2 % surface moisture. Heavily contaminated feed is worth washing first, because dirt becomes dust in the afterburner and load on the bag filter.

Can it process painted aluminium sheet as well as cans?

Yes in campaigns, with a longer dwell and a lower set point. Foil and thin sheet can overheat quickly, so the drum speed and zone temperature are changed between campaigns.

What emission control is included?

Cyclone, afterburner and bag filter as standard. Stack monitoring is supplied to local specification on request; the afterburner is sized on the peak volatile load, not the average.

Tell us the material and the tonnage

We size the line from your feed analysis, not from a catalogue page — proposal and layout within one working week.