2 t/h UBC Decoated Aluminium Line
Two tonnes an hour is the size that matches a regional can collection point: enough to justify a burner, an afterburner and a heat-recovery train, small enough to fit under an existing roof. It takes baled or loose UBC, and delivers a furnace-ready charge above 96 % metal with the paint gone.
Line sequence
| Stage | Function | Power | Key setting |
|---|---|---|---|
| Bale breaker / shredder | Opens bales, shreds to 30–60 mm flake | 45 kW | Flake size sets decoating time |
| Dryer | Removes surface moisture and free liquid | 11 kW | Feed below 2 % moisture |
| Rotary decoater | Low-oxygen burn-off of lacquer and paint | 7.5 kW drive + burner | 480–520 °C, 4–7 min dwell |
| Afterburner | Oxidises volatiles before the stack | 5.5 kW | Sized on peak volatile load |
| Cooling and discharge | Indirect cooling, dust extraction | 6 kW | Discharge below 120 °C |
Why the metal temperature ceiling matters more than throughput
Aluminium melts at 660 °C, and a decoater that overshoots does not fail loudly — it produces a sticky, partially melted charge that welds itself to the flight and the discharge chute. The line holds a 560 °C alarm and a 580 °C burner cut-out, and the control loop reads flake-bed temperature rather than gas temperature, because the two differ by 60–90 °C in a rotary drum.
Staying below the ceiling is what sets the dwell time, and dwell time sets throughput for a given drum volume. That is why a 2 t/h line and a 4 t/h line are not the same machine run faster: the larger unit has a longer drum and a bigger burner, and the afterburner grows with it. Buying a 2 t/h unit and pushing 3 t/h produces under-decoated metal that smokes in the customer’s furnace — a complaint that ends contracts faster than any price difference.
Operating figures
| Item | Value | Notes |
|---|---|---|
| Gas consumption | 28–38 m³/t | Natural gas; LPG at 11–15 kg/t |
| Heat recovery | 60–75 % of burner duty | Preheats combustion air and dryer |
| Metal loss | 1.0–1.8 % | Oxidation and fines; rises with dirty feed |
| Organics removed | 3–5 % of feed mass | Paint, lacquer, residual beverage |
| Crew | 3 per shift | One on the burner and controls |
| Capital, indicative | USD 380k–540k | EXW, excluding civils and stack |
Related pages
MSK network
Aggregates and mining equipment: mskmachinery.com. Export contracts: Sino Qtech Industries.
Manufacturer and compliance facts
Henan MSK Machinery Co., Ltd. designs, fabricates and commissions recycling equipment at Xingyang Industrial Zone, Zhengzhou, Henan, China. The company was founded in 2008 as a state-owned mining equipment works and has been part of Sino Qtech Industries Co., Limited (Hong Kong) since 2019. Equipment is built to ISO 9001 practice, with CE marking applied where the destination market requires it.
References used in this page’s engineering claims: EU WEEE Directive 2012/19/EU · Basel Convention on waste shipments · US DOE — Waste Reduction & Recycling · ISO 9001 quality management
Questions buyers ask before the proposal
What feed specification does the line need?
Baled or loose UBC, free of steel and PET, below 2 % surface moisture. Heavily contaminated feed is worth washing first, because dirt becomes dust in the afterburner and load on the bag filter.
Can it process painted aluminium sheet as well as cans?
Yes in campaigns, with a longer dwell and a lower set point. Foil and thin sheet can overheat quickly, so the drum speed and zone temperature are changed between campaigns.
What emission control is included?
Cyclone, afterburner and bag filter as standard. Stack monitoring is supplied to local specification on request; the afterburner is sized on the peak volatile load, not the average.