300 Modules per Shift PV Recycling Line
This is the entry size that still recovers every fraction: aluminium frame, tempered glass, cells with their silver, ribbon copper and junction box. One module position, three operators, 48–65 kW — and a footprint that fits inside an existing warehouse bay. It suits a collection business handling 40–70 tonnes of panels a month.
Station by station
| Station | Function | Power | Output |
|---|---|---|---|
| Frame remover | Cuts corner keys, draws the extrusion off | 7.5 kW | Frame ≥ 99 % clean |
| Glass separator | Lifts the front glass in one piece where the EVA allows | 11 kW | Glass 96–99 % recovery |
| Tunnel furnace | Burns the encapsulant where peeling fails | 24 kW + burner | Clean cells, off-gas to afterburner |
| Cell milling & separation | Cuts strings, mills and sieves the cell fraction | 18.5 kW | Silver-bearing concentrate |
| Dust and off-gas | Cyclone, bag filter, afterburner | 6 kW | Compliant stack |
What this size can and cannot do
It can run a single module at a time through frame removal and glass separation with two operators, and it recovers the four saleable streams without sending mixed laminate to landfill. What it cannot do is absorb a sudden contract: a 40 ft container of panels is about 700 modules, which is two and a half shifts. Buyers who win utility-scale decommissioning work usually need the three-position line.
The furnace is the part that decides whether the line is worth having. Where the EVA bond has degraded — most field panels older than eight years — glass lifts mechanically and the furnace runs only on the residue, at low duty. Where panels are younger or from a factory, the bond holds and the furnace carries the whole load. Ask for the split before choosing between a furnace-led and a purely mechanical line.
Outputs and where they go
| Fraction | Share of module mass | Typical buyer |
|---|---|---|
| Aluminium frame | 10–13 % | Secondary aluminium smelter |
| Tempered glass | 68–72 % | Glass cullet processor, or back to glassmaking after cleaning |
| Silicon cells + silver | 4–6 % | Refiner, silver concentrate at 12:1–25:1 |
| Ribbon copper and junction box | 1–2 % | Copper scrap dealer |
| Encapsulant and backsheet | 8–12 % | Thermal recovery or controlled disposal |
Related pages
MSK network
Aggregates and mining equipment: mskmachinery.com. Export contracts: Sino Qtech Industries.
Manufacturer and compliance facts
Henan MSK Machinery Co., Ltd. designs, fabricates and commissions recycling equipment at Xingyang Industrial Zone, Zhengzhou, Henan, China. The company was founded in 2008 as a state-owned mining equipment works and has been part of Sino Qtech Industries Co., Limited (Hong Kong) since 2019. Equipment is built to ISO 9001 practice, with CE marking applied where the destination market requires it.
References used in this page’s engineering claims: EU WEEE Directive 2012/19/EU · Basel Convention on waste shipments · US DOE — Waste Reduction & Recycling · ISO 9001 quality management
Questions buyers ask before the proposal
How many panels does one shift process?
200–300 in eight hours for intact field panels. Broken or laminate-only feed runs faster through the furnace route, up to 350, because frame removal is skipped.
Can silver be recovered on this line?
It is concentrated, not refined. The milled cell fraction reports 88–94 % of the silver into a concentrate that a licensed refiner closes. On-site hydrometallurgy needs effluent treatment and permitting that rarely pays at this scale.
What power supply is needed?
65 kW installed, so a 100 kVA transformer is adequate. The furnace and afterburner are the largest single loads at start-up.
What does the line need in labour?
Three per shift: one on frame and glass, one on the furnace and milling, one on outputs and packing. A fourth is useful for loading and dispatch.