Xingyang Industrial Zone, Zhengzhou, Henan, China

300 Modules per Shift PV Recycling Line

This is the entry size that still recovers every fraction: aluminium frame, tempered glass, cells with their silver, ribbon copper and junction box. One module position, three operators, 48–65 kW — and a footprint that fits inside an existing warehouse bay. It suits a collection business handling 40–70 tonnes of panels a month.

200–300Modules per 8 h shift
≈0.8 t/hAverage feed
48–65 kWInstalled power
18 × 6 mLine footprint

Station by station

Station Function Power Output
Frame remover Cuts corner keys, draws the extrusion off 7.5 kW Frame ≥ 99 % clean
Glass separator Lifts the front glass in one piece where the EVA allows 11 kW Glass 96–99 % recovery
Tunnel furnace Burns the encapsulant where peeling fails 24 kW + burner Clean cells, off-gas to afterburner
Cell milling & separation Cuts strings, mills and sieves the cell fraction 18.5 kW Silver-bearing concentrate
Dust and off-gas Cyclone, bag filter, afterburner 6 kW Compliant stack

What this size can and cannot do

It can run a single module at a time through frame removal and glass separation with two operators, and it recovers the four saleable streams without sending mixed laminate to landfill. What it cannot do is absorb a sudden contract: a 40 ft container of panels is about 700 modules, which is two and a half shifts. Buyers who win utility-scale decommissioning work usually need the three-position line.

The furnace is the part that decides whether the line is worth having. Where the EVA bond has degraded — most field panels older than eight years — glass lifts mechanically and the furnace runs only on the residue, at low duty. Where panels are younger or from a factory, the bond holds and the furnace carries the whole load. Ask for the split before choosing between a furnace-led and a purely mechanical line.

Outputs and where they go

Fraction Share of module mass Typical buyer
Aluminium frame 10–13 % Secondary aluminium smelter
Tempered glass 68–72 % Glass cullet processor, or back to glassmaking after cleaning
Silicon cells + silver 4–6 % Refiner, silver concentrate at 12:1–25:1
Ribbon copper and junction box 1–2 % Copper scrap dealer
Encapsulant and backsheet 8–12 % Thermal recovery or controlled disposal
Capital, indicative: USD 210k–310k EXW for the line including furnace, afterburner and controls; add civils, extraction ducting and the permit application. Power at 65 kW installed needs a 100 kVA supply, or a 125 kVA generator on a remote site.

Related pages

MSK network

Aggregates and mining equipment: mskmachinery.com. Export contracts: Sino Qtech Industries.

Manufacturer and compliance facts

Henan MSK Machinery Co., Ltd. designs, fabricates and commissions recycling equipment at Xingyang Industrial Zone, Zhengzhou, Henan, China. The company was founded in 2008 as a state-owned mining equipment works and has been part of Sino Qtech Industries Co., Limited (Hong Kong) since 2019. Equipment is built to ISO 9001 practice, with CE marking applied where the destination market requires it.

Legal entityHenan MSK Machinery Co., Ltd.
WorksXingyang Industrial Zone, Zhengzhou, Henan 450100, CN
Second siteGongyi — castings, wear parts, heat treatment
Export contractorSino Qtech Industries Co., Limited, Hong Kong
Quality systemISO 9001 practice; CE on request
Contact+86 133 5377 2661 · [email protected]

References used in this page’s engineering claims: EU WEEE Directive 2012/19/EU · Basel Convention on waste shipments · US DOE — Waste Reduction & Recycling · ISO 9001 quality management

Questions buyers ask before the proposal

How many panels does one shift process?

200–300 in eight hours for intact field panels. Broken or laminate-only feed runs faster through the furnace route, up to 350, because frame removal is skipped.

Can silver be recovered on this line?

It is concentrated, not refined. The milled cell fraction reports 88–94 % of the silver into a concentrate that a licensed refiner closes. On-site hydrometallurgy needs effluent treatment and permitting that rarely pays at this scale.

What power supply is needed?

65 kW installed, so a 100 kVA transformer is adequate. The furnace and afterburner are the largest single loads at start-up.

What does the line need in labour?

Three per shift: one on frame and glass, one on the furnace and milling, one on outputs and packing. A fourth is useful for loading and dispatch.

Tell us the material and the tonnage

We size the line from your feed analysis, not from a catalogue page — proposal and layout within one working week.