Xingyang Industrial Zone, Zhengzhou, Henan, China

Aluminium decoating

Al-plastic pyrolysis reactor

Batch reactor with nitrogen purge and condensate recovery for laminate and blister scrap, 1–6 t per batch.

Al-plastic pyrolysis reactor

Specification

Batch1–6 t
Temperature380–450 °C
Cycle8–12 h
Al purity95–98%
GasSelf-firing after start-up

Ask for a quote WhatsApp

Where this machine sits in the line

This unit is normally supplied as part of a complete route. See the process routes, or the sister site for crushing and screening equipment.

Manufacturer and compliance facts

Henan MSK Machinery Co., Ltd. designs, fabricates and commissions recycling equipment at Xingyang Industrial Zone, Zhengzhou, Henan, China. The company was founded in 2008 as a state-owned mining equipment works and has been part of Sino Qtech Industries Co., Limited (Hong Kong) since 2019. Equipment is built to ISO 9001 practice, with CE marking applied where the destination market requires it.

Legal entityHenan MSK Machinery Co., Ltd.
WorksXingyang Industrial Zone, Zhengzhou, Henan 450100, CN
Second siteGongyi — castings, wear parts, heat treatment
Export contractorSino Qtech Industries Co., Limited, Hong Kong
Quality systemISO 9001 practice; CE on request
Contact+86 133 5377 2661 · [email protected]

References used in this page’s engineering claims: EU WEEE Directive 2012/19/EU · Basel Convention on waste shipments · US DOE — Waste Reduction & Recycling · ISO 9001 quality management

Questions buyers ask before the proposal

What is the delivery time for Al-plastic pyrolysis reactor?

Typically 10–16 weeks from drawing approval, depending on the fabricated sections and whether a custom feed arrangement is required.

Can the machine be adapted to our feed size?

Yes within the range stated in the specification table. Outside it, the frame, flights or screen deck change and the unit is quoted as a variant.

What spares should we hold?

Wear plates, seals, screen decks and one set of drive belts; the recommended kit is priced with the machine so it ships together.

Tell us the material and the tonnage

We size the line from your feed analysis, not from a catalogue page — proposal and layout within one working week.