Aluminium cans
UBC decoating line
Paint, lacquer and residual beverage burn off a shredded can stream without melting the metal, leaving a furnace-ready charge with low oxidation loss.

Why the line is built this way
Used beverage cans carry 3–5% organic coating by weight. A remelt furnace that receives them coated pays for that twice: once in metal lost to oxidation and once in dross and emissions treatment. Decoating before melting moves that cost upstream where it is controllable.
Our line shreds to a controlled flake size, dries surface moisture, then passes the flakes through a rotary or belt decoater at 480–520 °C in a low-oxygen atmosphere. Volatiles are routed to an afterburner; the aluminium leaves at above 96% metal content and goes straight into a melting furnace.
Heat recovery on the afterburner supplies most of the decoater demand, which is where the operating cost case is made. We publish the gas consumption per tonne of product for each configuration rather than a single headline number.
- Shredding
- Drying
- Low-oxygen decoating
- Afterburner
- Cooling & discharge
Line envelope
| Throughput | 1–8 t/h |
|---|---|
| Decoating temperature | 480–520 °C |
| Metal content out | ≥ 96% |
| Fuel | Natural gas / LPG / producer gas |
| Heat recovery | 60–75% of burner duty |
Figures are for the standard configuration; a feed assay usually moves them by 10–20%. We confirm against your material before the contract.
MSK network
Crushing, screening and mineral processing plants for the same works: mskmachinery.com. Export contracts by Sino Qtech Industries.
Manufacturer and compliance facts
Henan MSK Machinery Co., Ltd. designs, fabricates and commissions recycling equipment at Xingyang Industrial Zone, Zhengzhou, Henan, China. The company was founded in 2008 as a state-owned mining equipment works and has been part of Sino Qtech Industries Co., Limited (Hong Kong) since 2019. Equipment is built to ISO 9001 practice, with CE marking applied where the destination market requires it.
References used in this page’s engineering claims: EU WEEE Directive 2012/19/EU · Basel Convention on waste shipments · US DOE — Waste Reduction & Recycling · ISO 9001 quality management
Questions buyers ask before the proposal
Why decoat instead of melting coated cans?
Coating burns inside the melt and takes metal with it as dross. Removing it upstream cuts oxidation loss and reduces fume treatment load on the furnace.
How much gas does decoating use?
With afterburner heat recovery, 60–75% of burner duty is recovered; consumption per tonne is published for each configuration rather than quoted as a single figure.
Does the line handle wet cans?
A dryer stage is included. Surface moisture costs energy and lowers the achieved metal content, so it is removed before the kiln.
Where is the equipment manufactured?
All lines are fabricated, machined and assembled at Xingyang Industrial Zone, Zhengzhou, Henan. Castings and heat-treated parts come from the group’s Gongyi site, 30 km west.
How do we start a project?
Send the material, a photo of the feed and the tonnage per shift. We reply with a separation sequence, a layout and a budget range before any contract discussion.