Technical notes and buying guides
Capacity tables, wear life, commissioning lessons and market notes from the MSK engineering team.
2026-09-25Commissioning a 300 t/h Gold ore Plant: Sequence and Hold PointsGold ore plant at 300 t/h: commissioning and ramp-up for a turnkey project, with the figures we use in proposals.
2026-09-24Layout and Civils for a 200 t/h Feldspar PlantFeldspar plant at 200 t/h: layout and civils for a turnkey project, with the figures we use in proposals.
2026-09-23Copper ore Plant at 150 t/h: Capital and Operating Cost StructureCopper ore plant at 150 t/h: capital and operating cost for a turnkey project, with the figures we use in proposals.
2026-09-22Feasibility for a 100 t/h Bauxite Plant: The Mass Balance That Decides ItBauxite plant at 100 t/h: feasibility and mass balance for a turnkey project, with the figures we use in proposals.
2026-09-21Payback Model for a Iron ore Plant at 50 t/hIron ore plant at 50 t/h: finance and payback for a turnkey project, with the figures we use in proposals.
2026-09-20Scope Split in an EPC Contract for a Gold ore PlantGold ore plant at 300 t/h: contract and scope split for a turnkey project, with the figures we use in proposals.
2026-09-19Debottlenecking a Feldspar Plant: Where the Capacity Actually HidesFeldspar plant at 200 t/h: retrofit and debottlenecking for a turnkey project, with the figures we use in proposals.
2026-09-18Maintenance Strategy for a Copper ore Plant: From Kit to ContractCopper ore plant at 150 t/h: maintenance strategy for a turnkey project, with the figures we use in proposals.
2026-09-17Control Philosophy for a 100 t/h Bauxite PlantBauxite plant at 100 t/h: control and automation for a turnkey project, with the figures we use in proposals.
2026-09-16Logistics for a Iron ore Plant: Ports, Roads and Site ConditionsIron ore plant at 50 t/h: logistics and site conditions for a turnkey project, with the figures we use in proposals.