A Iron ore plant at 50 t/h is a shipping problem before it is a process problem. Reactor shells, crusher frames and long conveyor sections decide the container or breakbulk plan, and the plan decides the erection sequence.
Logistics and site conditions
Check the last kilometre before the order: bridge limits, road width, and whether a low-bed can reach the site. We have seen a plant complete on the quay and then wait three weeks for a bridge permit.
Site conditions change the specification more than customers expect. Altitude derates motors, humidity decides insulation class, and a monsoon season decides whether the feed can be dried in the open or needs a covered stockpile.
What we need from the owner
Feed sample and analysis, target output and specification, site location and power available, and the commercial model for the product. With those we issue a mass balance, an equipment list, a power demand and a budget range before any drawing is committed.
Where this fits
Route: Mineral processing. Feed: Iron ore from a magnetite or haematite body, bulk density 3.20 t/m³, work index 15–20 kWh/t. Product: sinter feed or pellet feed.