Skip to content
MSK Machinery

Layout and Civils for a 200 t/h Feldspar Plant

Layout decisions are cheap on paper and expensive in concrete. On a Feldspar plant at 200 t/h, the first constraint is the haul route: how the feed arrives, where it can be tipped, and whether the primary can be fed directly from a truck or needs a hopper and a feeder.

Layout and civils

The second is fall height. Every extra metre of drop adds dust, attrition and wear. A layout that keeps the screening close to the crushing stage, with short chutes at shallow angles, will outlast one that stacks equipment to save footprint.

Leave room for the maintenance that will actually happen: a crane runway over the crusher, access to the discharge conveyor, and space to pull a screen deck. Plants that are tight to the wall are plants that stop for a day to change a belt.

What we need from the owner

Feed sample and analysis, target output and specification, site location and power available, and the commercial model for the product. With those we issue a mass balance, an equipment list, a power demand and a budget range before any drawing is committed.

Where this fits

Route: Mineral processing. Feed: Feldspar from a pegmatite body, bulk density 2.60 t/m³, work index 11–13 kWh/t. Product: ceramic grade powder.

Related: solutions index · process routes · request a proposal.

Factory direct

Tell us your feed material and target output

We size the machine or line, confirm power and layout, and send a written quotation within one working day.

Home Solutions Cases Contact WhatsApp