Skip to content
MSK Machinery

Technical notes and buying guides

Capacity tables, wear life, commissioning lessons and market notes from the MSK engineering team.

2026-10-05Gold ore Plant at 300 t/h: Capital and Operating Cost StructureGold ore plant at 300 t/h: capital and operating cost for a turnkey project, with the figures we use in proposals. 2026-10-04Feasibility for a 200 t/h Feldspar Plant: The Mass Balance That Decides ItFeldspar plant at 200 t/h: feasibility and mass balance for a turnkey project, with the figures we use in proposals. 2026-10-03Payback Model for a Copper ore Plant at 150 t/hCopper ore plant at 150 t/h: finance and payback for a turnkey project, with the figures we use in proposals. 2026-10-02Scope Split in an EPC Contract for a Bauxite PlantBauxite plant at 100 t/h: contract and scope split for a turnkey project, with the figures we use in proposals. 2026-10-01Debottlenecking a Iron ore Plant: Where the Capacity Actually HidesIron ore plant at 50 t/h: retrofit and debottlenecking for a turnkey project, with the figures we use in proposals. 2026-09-30Maintenance Strategy for a Gold ore Plant: From Kit to ContractGold ore plant at 300 t/h: maintenance strategy for a turnkey project, with the figures we use in proposals. 2026-09-29Control Philosophy for a 200 t/h Feldspar PlantFeldspar plant at 200 t/h: control and automation for a turnkey project, with the figures we use in proposals. 2026-09-28Logistics for a Copper ore Plant: Ports, Roads and Site ConditionsCopper ore plant at 150 t/h: logistics and site conditions for a turnkey project, with the figures we use in proposals. 2026-09-27Selling alumina feed from a Bauxite Plant: Spec, Tests and ContractsBauxite plant at 100 t/h: product spec and offtake for a turnkey project, with the figures we use in proposals. 2026-09-26Iron ore Processing Permits: Dust, Noise and Water ConditionsIron ore plant at 50 t/h: permitting and environmental control for a turnkey project, with the figures we use in proposals.

Factory direct

Tell us your feed material and target output

We size the machine or line, confirm power and layout, and send a written quotation within one working day.

Home Solutions Cases Contact WhatsApp