
Equipment · Coredrillrig
JS-2200 Fully Hydraulic Core Drill Rig
JS-2200 ultra-deep core drill rig drills 1100-2600 m. Weichai 199 kW, 500 L/min hydraulics, 40 t winch and a 13.3 t heavy-duty crawler chassis.
Mass balance and layout issued with the proposal
JS-2200 Fully Hydraulic Core Drill Rig is supplied as a unit inside a complete circuit, with the foundation loads, the drive and the wear profile matched to the duty it serves. The figures below are the ones we confirm in writing before an order.
Models and parameters
| Item | Specification |
|---|---|
| Drilling Capacity | |
| Diameter | HTW / NTW / BTW |
| Depth | 1100 / 2200 / 2600 m |
| Hydraulic System | |
| Rated Pressure | 28 MPa |
| Rated Flow | 500 L/min |
| Main / Auxiliary Pump | Kawasaki K3V140+140 / 32+32 |
| Cooling Method | Air cooling |
| Engine | |
| Brand | Weichai |
| Type | Six-cylinder turbo |
| Rated Speed | 2400 rpm |
| Rated Power | 199 kW |
| Power Unit | |
| Motor Type | Plunger motor |
| Motor Displacement | 180+180 mL |
| Transmission | Three-speed gearbox |
| Maximum Torque | 6800 N.m |
| Speed | 800-2000 rpm |
| Feed Stroke | 4300 mm |
| Tower | |
| Type | Touch-bottom integrated tower |
| Drilling Angle | 40-90 degrees |
| Lifting Force | 40 t |
| Feed Force | 20 t |
| Winch | |
| Lifting Force | 4 t |
| Speed | 0-300 rpm |
| Wire Rope Diameter | 8 mm |
| Rope Capacity | 1600 m |
| Rope Arrangement | Rotary swing angle winding |
| Crawler | |
| Operation Type | Remote control |
| Travel Speed | 0-6 km/h |
| Motor Type | High and low speed piston motor |
| Maximum Climbing Angle | 45 degrees |
| Mud Pump | |
| Brand | Elephant |
| Rated Flow | 250 L/min |
| Pressure | 12 MPa or less |
| Dimensions and Weight | |
| Overall Dimensions | 7400 x 2100 x 2750 mm |
| Machine Weight | 13.3 t |
Where it sits in a line
Position in the flowsheet decides the opening, the setting and the wear alloy. A unit bought for a duty it was not sized for will run, but at a cost per tonne that shows up within a season.
Supply scope
Frame, drive, guards, foundation plan, manual and the recommended first-year wear kit. Installation supervision and commissioning are available with the line contract.
See the solution index for the circuits this unit serves.