Maintenance strategy on a Granite plant is a choice between carrying stock and carrying risk. The right answer depends on how far the site is from a supplier and how much a stoppage costs per hour.
Maintenance strategy
The minimum is a first-year kit: the wear set for each chamber, belts, filter elements, sensors and a set of fasteners. Beyond that, the decision is which long-lead castings to hold. A mantle that takes 30 days to pour is worth stocking if the plant cannot run without it.
Condition monitoring pays where the drive is large. Vibration and oil sampling on the main bearings catch a failure weeks before it becomes a fire or a seized shaft, and the cost is a fraction of the downtime.
What we need from the owner
Feed sample and analysis, target output and specification, site location and power available, and the commercial model for the product. With those we issue a mass balance, an equipment list, a power demand and a budget range before any drawing is committed.
Where this fits
Route: Hard rock & aggregates. Feed: Granite from a hard rock quarry, bulk density 2.65 t/m³, work index 13–15 kWh/t. Product: aggregate for concrete and asphalt.
Related: solutions index · process routes · request a proposal.