Skip to content
MSK Machinery

Technical notes and buying guides

Capacity tables, wear life, commissioning lessons and market notes from the MSK engineering team.

2026-11-04Payback Model for a Mixed plastic Plant at 10 t/dayMixed plastic plant at 10 t/day: finance and payback for a turnkey project, with the figures we use in proposals. 2026-11-03Scope Split in an EPC Contract for a Wood chips PlantWood chips plant at 5 t/day: contract and scope split for a turnkey project, with the figures we use in proposals. 2026-11-02Debottlenecking a Coconut shell Plant: Where the Capacity Actually HidesCoconut shell plant at 50 t/day: retrofit and debottlenecking for a turnkey project, with the figures we use in proposals. 2026-11-01Maintenance Strategy for a Mixed plastic Plant: From Kit to ContractMixed plastic plant at 30 t/day: maintenance strategy for a turnkey project, with the figures we use in proposals. 2026-10-31Control Philosophy for a 20 t/day Wood chips PlantWood chips plant at 20 t/day: control and automation for a turnkey project, with the figures we use in proposals. 2026-10-30Logistics for a Coconut shell Plant: Ports, Roads and Site ConditionsCoconut shell plant at 10 t/day: logistics and site conditions for a turnkey project, with the figures we use in proposals. 2026-10-29Selling pyrolysis oil from a Mixed plastic Plant: Spec, Tests and ContractsMixed plastic plant at 5 t/day: product spec and offtake for a turnkey project, with the figures we use in proposals. 2026-10-28Commissioning a 100 t/h Steel slag Plant: Sequence and Hold PointsSteel slag plant at 100 t/h: commissioning and ramp-up for a turnkey project, with the figures we use in proposals. 2026-10-27Layout and Civils for a 400 t/h Municipal solid waste PlantMunicipal solid waste plant at 400 t/h: layout and civils for a turnkey project, with the figures we use in proposals. 2026-10-26Construction waste Plant at 300 t/h: Capital and Operating Cost StructureConstruction waste plant at 300 t/h: capital and operating cost for a turnkey project, with the figures we use in proposals.

Factory direct

Tell us your feed material and target output

We size the machine or line, confirm power and layout, and send a written quotation within one working day.

Home Solutions Cases Contact WhatsApp