Retrofit wins when the constraint is downstream and the frames are sound. Replacement wins when wear surfaces, drives and steel are all at the end of life at once.
Why it matters
Plant decisions are made early and paid for late. The questions below are the ones that change the outcome of a project, and they are cheap to ask while the layout is still on paper.
In practice
We run this checklist with every client before issuing a proposal. Where an answer is missing, the proposal states the assumption and the price consequence of changing it. That single habit prevents most of the claims we see in the industry.
Next step
Send the feed analysis, the target output and the site conditions. We reply with a mass balance, an equipment list and a budget range, and we mark every assumption in the document.