A feasibility study for a Feldspar plant is not a document about crushers. It is a statement of what the ore or waste will do when you hit it, and what the market will pay for the result. The mass balance is where those two meet.
Feasibility and mass balance
Start with a representative sample, not a grab from the face. Feldspar at 2.60 t/m³ with a work index of 11–13 kWh/t behaves differently when it is wet, when it is weathered, and when the top size distribution has a long tail. The balance should carry a 15 per cent margin on the design tonnage for exactly that reason.
The output side is equally unforgiving. ceramic grade powder sells on a specification, and the specification sets the screen apertures, which set the crusher settings, which set the circulating load. A study that starts from a machine and works forward will usually produce a plant that cannot hit the spec without running at 60 per cent of its rated tonnage.
What we need from the owner
Feed sample and analysis, target output and specification, site location and power available, and the commercial model for the product. With those we issue a mass balance, an equipment list, a power demand and a budget range before any drawing is committed.
Where this fits
Route: Mineral processing. Feed: Feldspar from a pegmatite body, bulk density 2.60 t/m³, work index 11–13 kWh/t. Product: ceramic grade powder.
Related: solutions index · process routes · request a proposal.