An EPC contract for a Bauxite plant has to answer one question clearly: who owns the interface between process guarantee and site conditions. Ambiguity there is what turns a fixed price into a claim.
Contract and scope split
The scope split we recommend puts process design, equipment, steel and commissioning with the supplier, and civils, power supply to the MCC, water and site access with the owner. The performance test is then defined on the supplier's scope, with the owner's obligations listed as preconditions.
Payment milestones should follow deliverables, not calendar dates: on approval of the general arrangement, on factory test, on shipment, on mechanical completion, on performance test. That structure keeps both sides honest through a long build.
What we need from the owner
Feed sample and analysis, target output and specification, site location and power available, and the commercial model for the product. With those we issue a mass balance, an equipment list, a power demand and a budget range before any drawing is committed.
Where this fits
Route: Mineral processing. Feed: Bauxite from a lateritic deposit, bulk density 2.50 t/m³, work index 10–13 kWh/t. Product: alumina feed.
Related: solutions index · process routes · request a proposal.