Plant cost separates into four blocks: equipment, steel and civils, electrical and control, and the owner's costs. On a Copper ore plant at 150 t/h, equipment is usually 45–55 per cent, steel and civils 20–30 per cent, electricals 10–15 per cent, and the rest is engineering, freight, erection and contingency.
Capital and operating cost
Operating cost is where the surprises live. At a work index of 12–16 kWh/t, comminution power is the largest single line, followed by wear parts on abrasive feed and then labour. A plant designed to run one shift at 100 per cent costs far more per tonne than one designed to run two shifts at 70 per cent, because the fixed costs do not move.
The comparison that matters is cost per tonne delivered to the customer, not the invoice price of the equipment. Two quotations that differ by 15 per cent on price can differ by 40 per cent on cost per tonne once power, wear and downtime are counted.
What we need from the owner
Feed sample and analysis, target output and specification, site location and power available, and the commercial model for the product. With those we issue a mass balance, an equipment list, a power demand and a budget range before any drawing is committed.
Where this fits
Route: Mineral processing. Feed: Copper ore from a sulphide deposit, bulk density 2.80 t/m³, work index 12–16 kWh/t. Product: copper concentrate.