Scope Split in an EPC Contract for a River gravel Plant

An EPC contract for a River gravel plant has to answer one question clearly: who owns the interface between process guarantee and site conditions. Ambiguity there is what turns a fixed price into a claim.

Contract and scope split

The scope split we recommend puts process design, equipment, steel and commissioning with the supplier, and civils, power supply to the MCC, water and site access with the owner. The performance test is then defined on the supplier's scope, with the owner's obligations listed as preconditions.

Payment milestones should follow deliverables, not calendar dates: on approval of the general arrangement, on factory test, on shipment, on mechanical completion, on performance test. That structure keeps both sides honest through a long build.

What we need from the owner

Feed sample and analysis, target output and specification, site location and power available, and the commercial model for the product. With those we issue a mass balance, an equipment list, a power demand and a budget range before any drawing is committed.

Where this fits

Route: Hard rock & aggregates. Feed: River gravel from a alluvial deposit, bulk density 2.60 t/m³, work index 12–16 kWh/t. Product: washed aggregate and manufactured sand.

Related: solutions index · process routes · request a proposal.

Factory direct

Tell us your feed material and target output

We size the machine or line, confirm power and layout, and send a written quotation within one working day.

Home Solutions Cases Contact WhatsApp