Equipment questions, answered

168 answers on selection, capacity, wear parts, delivery and commissioning.

Who is MSK Machinery?

Henan MSK Machinery Co., Ltd. is a crushing and mineral processing manufacturer based in Xingyang Industrial Zone, Zhengzhou. The works started in 2008 as a state-owned mining equipment factory and was acquired in 2019 by Sino Qtech Industries Co., Limited of Hong Kong, which handles export contracts. Castings come from our Gongyi base, assembly and testing from Xingyang.

How do I get a quotation?

Send four numbers through the form or WhatsApp: top feed size, target tonnage per hour, hours per shift, and the product size you need to sell. Add the site country and the power available. A written quotation with model, price band, foundation loads and delivery window follows within one working day.

Do you sell single machines or complete lines?

Both. Single units ship with drawings, motor, guards and a first-year wear kit. Complete lines include layout design, steel structure, chutes, electrical cabinet, installation supervision and commissioning. Turnkey thermal and recycling lines are handled by our sister site msk-machinery.com.

What is the warranty?

Twelve months from commissioning or eighteen months from shipment, whichever comes first, covering manufacturing defects in the frame, drive and main castings. Wear parts are excluded because their life depends on the feed, but we replace any part that fails early for reasons other than wear and report the cause.

Which documents come with a shipment?

Test report, material certificates for the wear castings, general arrangement and foundation drawings, electrical diagram, lubrication chart, operation and maintenance manual in English, and the packing list. Certificates of origin and CE declarations are added where the destination requires them.

How long is production?

Standard single machines leave the works in 20–35 days after the deposit. Custom chutes, skid-mounted lines and mobile units take 45–70 days. Delivery time to port is quoted separately and depends on the sailing schedule.

Can you visit our site before we order?

Yes, for line projects. An engineer can travel to measure the site, check the power supply and review the haul road. For single machines, a video call with the site and a few photographs of the feed material is usually enough.

Do you provide installation?

Installation supervision is included in line contracts and available for single machines on request. We send a supervisor for the mechanical and electrical installation, stay through the test run and train the operators. Local labour is hired on site, which keeps the cost down.

What payment terms do you accept?

Thirty per cent deposit with the order, seventy per cent against the bill of lading, through the export contract with Sino Qtech Industries. Letters of credit are accepted for larger lines. Currency is usually USD or EUR.

Are your machines CE marked?

Where the machine configuration allows it and the destination market requires it. The marking covers the guards, emergency stops, signage and the declaration of conformity. We confirm in the quotation whether the specific model will carry CE, because a few very large units are supplied as industrial assemblies instead.

How do you handle spare parts after delivery?

Each machine ships with a recommended first-year kit: the wear set for the working chamber, drive belts, filter elements and the sensors that fail most often. Reorders go out in 3–7 days from stock, or 20–30 days for castings that have to be poured.

Can you match an existing plant layout?

Yes. Send the current layout, the capacities at each stage and photographs of the existing equipment. We design the new unit to fit the available footprint and, where possible, reuse the existing steelwork and conveyor take-up points.

What is the difference between msk-machinery.com and mskmachinery.com?

This site covers complete plants, turnkey recycling and thermal lines, and project engineering. mskmachinery.com is the equipment catalogue: individual machines, models and specifications. Export contracts for both run through Sino Qtech Industries.

Do you supply to Africa, Asia and South America?

Machines are running in more than thirty countries, including Nigeria, Ghana, Kenya, Ethiopia, Uzbekistan, Indonesia, the Philippines, Chile, Peru and Mexico. We keep spares depots with partners in Nigeria, Indonesia and Chile to shorten the wait for wear parts.

Can I see a machine running before buying?

Yes. We can arrange a visit to the Xingyang works for a test run on your own material, or a reference visit to a customer plant in your region. For used machines, the inspection video and report are sent before any deposit.

What power supply do the machines need?

Most units are built for 380–415 V, 50 Hz, three phase, with other voltages available. Mobile units run on diesel or on site power through a changeover panel. Tell us the voltage and frequency at the quotation stage; changing a motor after build is expensive.

How is the machine packed for sea freight?

Frames are bolted to steel skids inside a container, with the drive and electrical parts crated separately. Large rotors and jaws are braced to stop movement. Every shipment is photographed at loading and the images go to the buyer before the container is sealed.

Do you offer operator training?

Yes. Training happens during commissioning: start-up sequence, setting changes, lubrication intervals, wear measurement and the first response to a blockage. We leave a checklist in the manual and can run a refresher by video call after six months.

What is the typical lead time for wear castings?

Jaw plates, blow bars and screen meshes for common models are held in stock and ship in 3–7 days. Mantles and bowl liners for larger cones take 20–30 days because they are poured to order. Tell us the model and the serial number so the profile is right.

How do you handle a quality complaint?

We ask for photographs, the serial number and the running hours. If the part failed for a manufacturing reason we replace it and cover the freight. If the cause is the feed or the operation, we say so plainly and propose the change that prevents a repeat.

Can the machines run on a generator?

Yes, if the generator is sized for the starting current of the largest motor, not just the running load. As a rule the generator should be at least 1.6 times the installed power for a jaw or cone, and 2 times for a large ball mill. We supply the starting method that keeps the peak within the generator capacity.

Do you provide a layout drawing before the order?

A preliminary layout with the main dimensions and the foundation loads is free. A full general arrangement with anchor bolt positions, chute geometry and steelwork details is issued after the order, since it depends on the final model and the site survey.

What happens if the feed is wetter than expected?

Wet feed blinds screens and packs chutes. The fixes are a grizzly or a pre-screen, heated decks, rubber or polyurethane media instead of wire, and steeper chute angles. On clay-heavy material we may recommend a scrubber ahead of the screen. We size the circuit for the wet season, not the dry one.

Which markets do you not ship to?

We do not ship to countries under UN or EU sanctions, and we follow the export control rules that apply to the destination. Everything else is quoted normally through Sino Qtech Industries, with the documentation and inspection arranged by them.

What size feed can a crusher take?

For crusher duties the practical feed limit is 1,200 mm in the largest jaw model. Anything larger needs a breaker or a larger primary unit. We size the opening from the 95th percentile of your blast or excavation size, not the average, because the oversized lumps are what cause the stalls.

What capacity should I expect from a crusher?

5–1,000 t/h depending on model and setting. The band is wide on purpose: bulk density, moisture, the product size and the recirculating load all move the number. We confirm the figure in writing for your material before the order, and the commissioning test has to hold it.

How much power does a crusher need?

Installed power runs 5.5–400 kW. Starting current matters more than running current for generator sizing, so tell us if the site has no grid supply. We can specify a soft starter or a variable frequency drive where the supply is weak.

Which wear parts does a crusher consume?

The recurring items are jaw plates, mantle and bowl liner, blow bars. Life depends on the silica content and the crushability of the rock. We ask for a sieve analysis and, where possible, a Bond work index so the first wear kit is sized to the duty instead of a generic default.

When should I choose a crusher over an alternative?

Choose it when your duty is hard rock such as granite, basalt and gabbro. Where that is not the case, a hammer crusher where the rock is soft and the product shape is not critical is often the better fit. The decision should follow the material and the product spec, not the price of the machine alone.

What does a crusher cost?

Price depends on the model, the drive, the wear alloy and the automation level. A single unit is quoted as a machine price; a line is quoted stage by stage with the steelwork and electricals separated, so you can see what each part contributes. We do not publish list prices because freight and configuration move them too much.

How long does installation take for a crusher?

A single unit is usually set, aligned and test run in two to four days with a competent local crew. A line with a crusher at its centre takes two to four weeks, including steelwork, chutes, electricals and the commissioning checks. We supply a day-by-day plan with the drawings.

What maintenance does a crusher need?

Daily: walk-around, grease points, belt tension, unusual noise. Weekly: wear measurement, bolt torque, screen or liner inspection. Monthly: oil sampling where the drive is oil-lubricated, alignment check, electrical insulation test. The manual lists every interval against the part, and the first-year kit covers the consumables.

What is the most common failure on a crusher?

Loose foundations and overloaded drives account for most early failures, not the castings. A machine that shakes will crack its frame within a season. The second most common cause is feeding beyond the designed top size. Both are preventable with the installation checks we supply.

Can a crusher handle wet or sticky material?

Only with preparation. Wet feed reduces throughput, blinds screens and packs chutes. The usual fixes are a pre-screen, a grizzly, steeper chutes, rubber media and, for clay, a scrubber. We would rather redesign the front of the circuit than sell a bigger crusher and hope.

What information do you need to size a crusher?

Top feed size, target tonnage per hour, hours per day, product sizes required, bulk density, moisture, silica content if known, power available, and the site altitude and climate. Photographs of the feed and the existing circuit help more than a long description.

Is a crusher available for hire or as a used unit?

Used units appear in our used machinery section after inspection, with a report on the frame, the drive and the wear parts. Hire is handled through local partners rather than from the factory, because mobilisation and site support have to be close to the job.

What size feed can a feeder and screen take?

For feeder and screen duties the practical feed limit is up to 1,000 mm lump size on the grizzly section. Anything larger needs a breaker or a larger primary unit. We size the opening from the 95th percentile of your blast or excavation size, not the average, because the oversized lumps are what cause the stalls.

What capacity should I expect from a feeder and screen?

50–1,200 t/h. The band is wide on purpose: bulk density, moisture, the product size and the recirculating load all move the number. We confirm the figure in writing for your material before the order, and the commissioning test has to hold it.

How much power does a feeder and screen need?

Installed power runs 3–45 kW. Starting current matters more than running current for generator sizing, so tell us if the site has no grid supply. We can specify a soft starter or a variable frequency drive where the supply is weak.

Which wear parts does a feeder and screen consume?

The recurring items are grizzly bars, screen meshes, side liners. Life depends on the silica content and the crushability of the rock. We ask for a sieve analysis and, where possible, a Bond work index so the first wear kit is sized to the duty instead of a generic default.

When should I choose a feeder and screen over an alternative?

Choose it when your duty is wet, sticky or heavily lumped feed. Where that is not the case, an apron feeder where the material is sticky and the drop height is large is often the better fit. The decision should follow the material and the product spec, not the price of the machine alone.

What does a feeder and screen cost?

Price depends on the model, the drive, the wear alloy and the automation level. A single unit is quoted as a machine price; a line is quoted stage by stage with the steelwork and electricals separated, so you can see what each part contributes. We do not publish list prices because freight and configuration move them too much.

How long does installation take for a feeder and screen?

A single unit is usually set, aligned and test run in two to four days with a competent local crew. A line with a feeder and screen at its centre takes two to four weeks, including steelwork, chutes, electricals and the commissioning checks. We supply a day-by-day plan with the drawings.

What maintenance does a feeder and screen need?

Daily: walk-around, grease points, belt tension, unusual noise. Weekly: wear measurement, bolt torque, screen or liner inspection. Monthly: oil sampling where the drive is oil-lubricated, alignment check, electrical insulation test. The manual lists every interval against the part, and the first-year kit covers the consumables.

What is the most common failure on a feeder and screen?

Loose foundations and overloaded drives account for most early failures, not the castings. A machine that shakes will crack its frame within a season. The second most common cause is feeding beyond the designed top size. Both are preventable with the installation checks we supply.

Can a feeder and screen handle wet or sticky material?

Only with preparation. Wet feed reduces throughput, blinds screens and packs chutes. The usual fixes are a pre-screen, a grizzly, steeper chutes, rubber media and, for clay, a scrubber. We would rather redesign the front of the circuit than sell a bigger feeder and screen and hope.

What information do you need to size a feeder and screen?

Top feed size, target tonnage per hour, hours per day, product sizes required, bulk density, moisture, silica content if known, power available, and the site altitude and climate. Photographs of the feed and the existing circuit help more than a long description.

Is a feeder and screen available for hire or as a used unit?

Used units appear in our used machinery section after inspection, with a report on the frame, the drive and the wear parts. Hire is handled through local partners rather than from the factory, because mobilisation and site support have to be close to the job.

What size feed can a mill take?

For mill duties the practical feed limit is usually below 30 mm after fine crushing. Anything larger needs a breaker or a larger primary unit. We size the opening from the 95th percentile of your blast or excavation size, not the average, because the oversized lumps are what cause the stalls.

What capacity should I expect from a mill?

0.5–120 t/h. The band is wide on purpose: bulk density, moisture, the product size and the recirculating load all move the number. We confirm the figure in writing for your material before the order, and the commissioning test has to hold it.

How much power does a mill need?

Installed power runs 7.5–1,250 kW. Starting current matters more than running current for generator sizing, so tell us if the site has no grid supply. We can specify a soft starter or a variable frequency drive where the supply is weak.

Which wear parts does a mill consume?

The recurring items are liners, grinding media, roller tyres and rings. Life depends on the silica content and the crushability of the rock. We ask for a sieve analysis and, where possible, a Bond work index so the first wear kit is sized to the duty instead of a generic default.

When should I choose a mill over an alternative?

Choose it when your duty is fine grinding to 80–400 mesh. Where that is not the case, a vertical mill where floor space is short and the product can tolerate a wider PSD is often the better fit. The decision should follow the material and the product spec, not the price of the machine alone.

What does a mill cost?

Price depends on the model, the drive, the wear alloy and the automation level. A single unit is quoted as a machine price; a line is quoted stage by stage with the steelwork and electricals separated, so you can see what each part contributes. We do not publish list prices because freight and configuration move them too much.

How long does installation take for a mill?

A single unit is usually set, aligned and test run in two to four days with a competent local crew. A line with a mill at its centre takes two to four weeks, including steelwork, chutes, electricals and the commissioning checks. We supply a day-by-day plan with the drawings.

What maintenance does a mill need?

Daily: walk-around, grease points, belt tension, unusual noise. Weekly: wear measurement, bolt torque, screen or liner inspection. Monthly: oil sampling where the drive is oil-lubricated, alignment check, electrical insulation test. The manual lists every interval against the part, and the first-year kit covers the consumables.

What is the most common failure on a mill?

Loose foundations and overloaded drives account for most early failures, not the castings. A machine that shakes will crack its frame within a season. The second most common cause is feeding beyond the designed top size. Both are preventable with the installation checks we supply.

Can a mill handle wet or sticky material?

Only with preparation. Wet feed reduces throughput, blinds screens and packs chutes. The usual fixes are a pre-screen, a grizzly, steeper chutes, rubber media and, for clay, a scrubber. We would rather redesign the front of the circuit than sell a bigger mill and hope.

What information do you need to size a mill?

Top feed size, target tonnage per hour, hours per day, product sizes required, bulk density, moisture, silica content if known, power available, and the site altitude and climate. Photographs of the feed and the existing circuit help more than a long description.

Is a mill available for hire or as a used unit?

Used units appear in our used machinery section after inspection, with a report on the frame, the drive and the wear parts. Hire is handled through local partners rather than from the factory, because mobilisation and site support have to be close to the job.

What size feed can a separator take?

For separator duties the practical feed limit is liberated pulp below 2 mm for most gravity and flotation duties. Anything larger needs a breaker or a larger primary unit. We size the opening from the 95th percentile of your blast or excavation size, not the average, because the oversized lumps are what cause the stalls.

What capacity should I expect from a separator?

10–2,000 m³/h of pulp. The band is wide on purpose: bulk density, moisture, the product size and the recirculating load all move the number. We confirm the figure in writing for your material before the order, and the commissioning test has to hold it.

How much power does a separator need?

Installed power runs 1.5–90 kW. Starting current matters more than running current for generator sizing, so tell us if the site has no grid supply. We can specify a soft starter or a variable frequency drive where the supply is weak.

Which wear parts does a separator consume?

The recurring items are impellers, stators, cell liners, screen decks. Life depends on the silica content and the crushability of the rock. We ask for a sieve analysis and, where possible, a Bond work index so the first wear kit is sized to the duty instead of a generic default.

When should I choose a separator over an alternative?

Choose it when your duty is liberation and concentration after grinding. Where that is not the case, a shaking table where the valuable mineral is coarse and the throughput is small is often the better fit. The decision should follow the material and the product spec, not the price of the machine alone.

What does a separator cost?

Price depends on the model, the drive, the wear alloy and the automation level. A single unit is quoted as a machine price; a line is quoted stage by stage with the steelwork and electricals separated, so you can see what each part contributes. We do not publish list prices because freight and configuration move them too much.

How long does installation take for a separator?

A single unit is usually set, aligned and test run in two to four days with a competent local crew. A line with a separator at its centre takes two to four weeks, including steelwork, chutes, electricals and the commissioning checks. We supply a day-by-day plan with the drawings.

What maintenance does a separator need?

Daily: walk-around, grease points, belt tension, unusual noise. Weekly: wear measurement, bolt torque, screen or liner inspection. Monthly: oil sampling where the drive is oil-lubricated, alignment check, electrical insulation test. The manual lists every interval against the part, and the first-year kit covers the consumables.

What is the most common failure on a separator?

Loose foundations and overloaded drives account for most early failures, not the castings. A machine that shakes will crack its frame within a season. The second most common cause is feeding beyond the designed top size. Both are preventable with the installation checks we supply.

Can a separator handle wet or sticky material?

Only with preparation. Wet feed reduces throughput, blinds screens and packs chutes. The usual fixes are a pre-screen, a grizzly, steeper chutes, rubber media and, for clay, a scrubber. We would rather redesign the front of the circuit than sell a bigger separator and hope.

What information do you need to size a separator?

Top feed size, target tonnage per hour, hours per day, product sizes required, bulk density, moisture, silica content if known, power available, and the site altitude and climate. Photographs of the feed and the existing circuit help more than a long description.

Is a separator available for hire or as a used unit?

Used units appear in our used machinery section after inspection, with a report on the frame, the drive and the wear parts. Hire is handled through local partners rather than from the factory, because mobilisation and site support have to be close to the job.

What size feed can a mobile plant take?

For mobile plant duties the practical feed limit is up to 800 mm with the largest jaw unit. Anything larger needs a breaker or a larger primary unit. We size the opening from the 95th percentile of your blast or excavation size, not the average, because the oversized lumps are what cause the stalls.

What capacity should I expect from a mobile plant?

30–400 t/h. The band is wide on purpose: bulk density, moisture, the product size and the recirculating load all move the number. We confirm the figure in writing for your material before the order, and the commissioning test has to hold it.

How much power does a mobile plant need?

Installed power runs diesel 130–500 kW or electric 90–315 kW. Starting current matters more than running current for generator sizing, so tell us if the site has no grid supply. We can specify a soft starter or a variable frequency drive where the supply is weak.

Which wear parts does a mobile plant consume?

The recurring items are jaw plates, blow bars, conveyor belts, screen mesh. Life depends on the silica content and the crushability of the rock. We ask for a sieve analysis and, where possible, a Bond work index so the first wear kit is sized to the duty instead of a generic default.

When should I choose a mobile plant over an alternative?

Choose it when your duty is short-term sites, road projects and demolition. Where that is not the case, a stationary line where the deposit life exceeds five years and the pit is fixed is often the better fit. The decision should follow the material and the product spec, not the price of the machine alone.

What does a mobile plant cost?

Price depends on the model, the drive, the wear alloy and the automation level. A single unit is quoted as a machine price; a line is quoted stage by stage with the steelwork and electricals separated, so you can see what each part contributes. We do not publish list prices because freight and configuration move them too much.

How long does installation take for a mobile plant?

A single unit is usually set, aligned and test run in two to four days with a competent local crew. A line with a mobile plant at its centre takes two to four weeks, including steelwork, chutes, electricals and the commissioning checks. We supply a day-by-day plan with the drawings.

What maintenance does a mobile plant need?

Daily: walk-around, grease points, belt tension, unusual noise. Weekly: wear measurement, bolt torque, screen or liner inspection. Monthly: oil sampling where the drive is oil-lubricated, alignment check, electrical insulation test. The manual lists every interval against the part, and the first-year kit covers the consumables.

What is the most common failure on a mobile plant?

Loose foundations and overloaded drives account for most early failures, not the castings. A machine that shakes will crack its frame within a season. The second most common cause is feeding beyond the designed top size. Both are preventable with the installation checks we supply.

Can a mobile plant handle wet or sticky material?

Only with preparation. Wet feed reduces throughput, blinds screens and packs chutes. The usual fixes are a pre-screen, a grizzly, steeper chutes, rubber media and, for clay, a scrubber. We would rather redesign the front of the circuit than sell a bigger mobile plant and hope.

What information do you need to size a mobile plant?

Top feed size, target tonnage per hour, hours per day, product sizes required, bulk density, moisture, silica content if known, power available, and the site altitude and climate. Photographs of the feed and the existing circuit help more than a long description.

Is a mobile plant available for hire or as a used unit?

Used units appear in our used machinery section after inspection, with a report on the frame, the drive and the wear parts. Hire is handled through local partners rather than from the factory, because mobilisation and site support have to be close to the job.

What size feed can a sand machine take?

For sand machine duties the practical feed limit is below 40 mm for VSI, below 10 mm for fine crushers. Anything larger needs a breaker or a larger primary unit. We size the opening from the 95th percentile of your blast or excavation size, not the average, because the oversized lumps are what cause the stalls.

What capacity should I expect from a sand machine?

20–600 t/h. The band is wide on purpose: bulk density, moisture, the product size and the recirculating load all move the number. We confirm the figure in writing for your material before the order, and the commissioning test has to hold it.

How much power does a sand machine need?

Installed power runs 37–400 kW. Starting current matters more than running current for generator sizing, so tell us if the site has no grid supply. We can specify a soft starter or a variable frequency drive where the supply is weak.

Which wear parts does a sand machine consume?

The recurring items are rotor tips, anvils, distributor plate, impeller shoes. Life depends on the silica content and the crushability of the rock. We ask for a sieve analysis and, where possible, a Bond work index so the first wear kit is sized to the duty instead of a generic default.

When should I choose a sand machine over an alternative?

Choose it when your duty is manufactured sand for concrete and asphalt. Where that is not the case, a rod mill where the sand must be almost cubic and the tonnage is small is often the better fit. The decision should follow the material and the product spec, not the price of the machine alone.

What does a sand machine cost?

Price depends on the model, the drive, the wear alloy and the automation level. A single unit is quoted as a machine price; a line is quoted stage by stage with the steelwork and electricals separated, so you can see what each part contributes. We do not publish list prices because freight and configuration move them too much.

How long does installation take for a sand machine?

A single unit is usually set, aligned and test run in two to four days with a competent local crew. A line with a sand machine at its centre takes two to four weeks, including steelwork, chutes, electricals and the commissioning checks. We supply a day-by-day plan with the drawings.

What maintenance does a sand machine need?

Daily: walk-around, grease points, belt tension, unusual noise. Weekly: wear measurement, bolt torque, screen or liner inspection. Monthly: oil sampling where the drive is oil-lubricated, alignment check, electrical insulation test. The manual lists every interval against the part, and the first-year kit covers the consumables.

What is the most common failure on a sand machine?

Loose foundations and overloaded drives account for most early failures, not the castings. A machine that shakes will crack its frame within a season. The second most common cause is feeding beyond the designed top size. Both are preventable with the installation checks we supply.

Can a sand machine handle wet or sticky material?

Only with preparation. Wet feed reduces throughput, blinds screens and packs chutes. The usual fixes are a pre-screen, a grizzly, steeper chutes, rubber media and, for clay, a scrubber. We would rather redesign the front of the circuit than sell a bigger sand machine and hope.

What information do you need to size a sand machine?

Top feed size, target tonnage per hour, hours per day, product sizes required, bulk density, moisture, silica content if known, power available, and the site altitude and climate. Photographs of the feed and the existing circuit help more than a long description.

Is a sand machine available for hire or as a used unit?

Used units appear in our used machinery section after inspection, with a report on the frame, the drive and the wear parts. Hire is handled through local partners rather than from the factory, because mobilisation and site support have to be close to the job.

What size feed can a wear part take?

For wear part duties the practical feed limit is not applicable — the part is matched to the machine. Anything larger needs a breaker or a larger primary unit. We size the opening from the 95th percentile of your blast or excavation size, not the average, because the oversized lumps are what cause the stalls.

What capacity should I expect from a wear part?

sized per model. The band is wide on purpose: bulk density, moisture, the product size and the recirculating load all move the number. We confirm the figure in writing for your material before the order, and the commissioning test has to hold it.

How much power does a wear part need?

Installed power runs not applicable. Starting current matters more than running current for generator sizing, so tell us if the site has no grid supply. We can specify a soft starter or a variable frequency drive where the supply is weak.

Which wear parts does a wear part consume?

The recurring items are itself. Life depends on the silica content and the crushability of the rock. We ask for a sieve analysis and, where possible, a Bond work index so the first wear kit is sized to the duty instead of a generic default.

When should I choose a wear part over an alternative?

Choose it when your duty is replacement of worn or cracked components. Where that is not the case, a local fabrication only where the alloy grade can be verified is often the better fit. The decision should follow the material and the product spec, not the price of the machine alone.

What does a wear part cost?

Price depends on the model, the drive, the wear alloy and the automation level. A single unit is quoted as a machine price; a line is quoted stage by stage with the steelwork and electricals separated, so you can see what each part contributes. We do not publish list prices because freight and configuration move them too much.

How long does installation take for a wear part?

A single unit is usually set, aligned and test run in two to four days with a competent local crew. A line with a wear part at its centre takes two to four weeks, including steelwork, chutes, electricals and the commissioning checks. We supply a day-by-day plan with the drawings.

What maintenance does a wear part need?

Daily: walk-around, grease points, belt tension, unusual noise. Weekly: wear measurement, bolt torque, screen or liner inspection. Monthly: oil sampling where the drive is oil-lubricated, alignment check, electrical insulation test. The manual lists every interval against the part, and the first-year kit covers the consumables.

What is the most common failure on a wear part?

Loose foundations and overloaded drives account for most early failures, not the castings. A machine that shakes will crack its frame within a season. The second most common cause is feeding beyond the designed top size. Both are preventable with the installation checks we supply.

Can a wear part handle wet or sticky material?

Only with preparation. Wet feed reduces throughput, blinds screens and packs chutes. The usual fixes are a pre-screen, a grizzly, steeper chutes, rubber media and, for clay, a scrubber. We would rather redesign the front of the circuit than sell a bigger wear part and hope.

What information do you need to size a wear part?

Top feed size, target tonnage per hour, hours per day, product sizes required, bulk density, moisture, silica content if known, power available, and the site altitude and climate. Photographs of the feed and the existing circuit help more than a long description.

Is a wear part available for hire or as a used unit?

Used units appear in our used machinery section after inspection, with a report on the frame, the drive and the wear parts. Hire is handled through local partners rather than from the factory, because mobilisation and site support have to be close to the job.

What size feed can a used machine take?

For used machine duties the practical feed limit is as recorded in the inspection report for each unit. Anything larger needs a breaker or a larger primary unit. We size the opening from the 95th percentile of your blast or excavation size, not the average, because the oversized lumps are what cause the stalls.

What capacity should I expect from a used machine?

as tested under load before dispatch. The band is wide on purpose: bulk density, moisture, the product size and the recirculating load all move the number. We confirm the figure in writing for your material before the order, and the commissioning test has to hold it.

How much power does a used machine need?

Installed power runs as plated on the original motor. Starting current matters more than running current for generator sizing, so tell us if the site has no grid supply. We can specify a soft starter or a variable frequency drive where the supply is weak.

Which wear parts does a used machine consume?

The recurring items are measured and reported, with replacements quoted. Life depends on the silica content and the crushability of the rock. We ask for a sieve analysis and, where possible, a Bond work index so the first wear kit is sized to the duty instead of a generic default.

When should I choose a used machine over an alternative?

Choose it when your duty is budget-limited or fast-start projects. Where that is not the case, a new unit where the duty is continuous and a two-year warranty matters is often the better fit. The decision should follow the material and the product spec, not the price of the machine alone.

What does a used machine cost?

Price depends on the model, the drive, the wear alloy and the automation level. A single unit is quoted as a machine price; a line is quoted stage by stage with the steelwork and electricals separated, so you can see what each part contributes. We do not publish list prices because freight and configuration move them too much.

How long does installation take for a used machine?

A single unit is usually set, aligned and test run in two to four days with a competent local crew. A line with a used machine at its centre takes two to four weeks, including steelwork, chutes, electricals and the commissioning checks. We supply a day-by-day plan with the drawings.

What maintenance does a used machine need?

Daily: walk-around, grease points, belt tension, unusual noise. Weekly: wear measurement, bolt torque, screen or liner inspection. Monthly: oil sampling where the drive is oil-lubricated, alignment check, electrical insulation test. The manual lists every interval against the part, and the first-year kit covers the consumables.

What is the most common failure on a used machine?

Loose foundations and overloaded drives account for most early failures, not the castings. A machine that shakes will crack its frame within a season. The second most common cause is feeding beyond the designed top size. Both are preventable with the installation checks we supply.

Can a used machine handle wet or sticky material?

Only with preparation. Wet feed reduces throughput, blinds screens and packs chutes. The usual fixes are a pre-screen, a grizzly, steeper chutes, rubber media and, for clay, a scrubber. We would rather redesign the front of the circuit than sell a bigger used machine and hope.

What information do you need to size a used machine?

Top feed size, target tonnage per hour, hours per day, product sizes required, bulk density, moisture, silica content if known, power available, and the site altitude and climate. Photographs of the feed and the existing circuit help more than a long description.

Is a used machine available for hire or as a used unit?

Used units appear in our used machinery section after inspection, with a report on the frame, the drive and the wear parts. Hire is handled through local partners rather than from the factory, because mobilisation and site support have to be close to the job.

What size feed can a drill rig take?

For drill rig duties the practical feed limit is not applicable. Anything larger needs a breaker or a larger primary unit. We size the opening from the 95th percentile of your blast or excavation size, not the average, because the oversized lumps are what cause the stalls.

What capacity should I expect from a drill rig?

30–800 m depth depending on rod string and ground. The band is wide on purpose: bulk density, moisture, the product size and the recirculating load all move the number. We confirm the figure in writing for your material before the order, and the commissioning test has to hold it.

How much power does a drill rig need?

Installed power runs 15–180 kW. Starting current matters more than running current for generator sizing, so tell us if the site has no grid supply. We can specify a soft starter or a variable frequency drive where the supply is weak.

Which wear parts does a drill rig consume?

The recurring items are core bits, reaming shells, rod couplings, water swivels. Life depends on the silica content and the crushability of the rock. We ask for a sieve analysis and, where possible, a Bond work index so the first wear kit is sized to the duty instead of a generic default.

When should I choose a drill rig over an alternative?

Choose it when your duty is exploration, geotechnical and grouting holes. Where that is not the case, a rotary table rig where the hole is shallow and vertical is often the better fit. The decision should follow the material and the product spec, not the price of the machine alone.

What does a drill rig cost?

Price depends on the model, the drive, the wear alloy and the automation level. A single unit is quoted as a machine price; a line is quoted stage by stage with the steelwork and electricals separated, so you can see what each part contributes. We do not publish list prices because freight and configuration move them too much.

How long does installation take for a drill rig?

A single unit is usually set, aligned and test run in two to four days with a competent local crew. A line with a drill rig at its centre takes two to four weeks, including steelwork, chutes, electricals and the commissioning checks. We supply a day-by-day plan with the drawings.

What maintenance does a drill rig need?

Daily: walk-around, grease points, belt tension, unusual noise. Weekly: wear measurement, bolt torque, screen or liner inspection. Monthly: oil sampling where the drive is oil-lubricated, alignment check, electrical insulation test. The manual lists every interval against the part, and the first-year kit covers the consumables.

What is the most common failure on a drill rig?

Loose foundations and overloaded drives account for most early failures, not the castings. A machine that shakes will crack its frame within a season. The second most common cause is feeding beyond the designed top size. Both are preventable with the installation checks we supply.

Can a drill rig handle wet or sticky material?

Only with preparation. Wet feed reduces throughput, blinds screens and packs chutes. The usual fixes are a pre-screen, a grizzly, steeper chutes, rubber media and, for clay, a scrubber. We would rather redesign the front of the circuit than sell a bigger drill rig and hope.

What information do you need to size a drill rig?

Top feed size, target tonnage per hour, hours per day, product sizes required, bulk density, moisture, silica content if known, power available, and the site altitude and climate. Photographs of the feed and the existing circuit help more than a long description.

Is a drill rig available for hire or as a used unit?

Used units appear in our used machinery section after inspection, with a report on the frame, the drive and the wear parts. Hire is handled through local partners rather than from the factory, because mobilisation and site support have to be close to the job.

What size feed can a charcoal line take?

For charcoal line duties the practical feed limit is biomass below 50 mm after chipping and drying. Anything larger needs a breaker or a larger primary unit. We size the opening from the 95th percentile of your blast or excavation size, not the average, because the oversized lumps are what cause the stalls.

What capacity should I expect from a charcoal line?

0.5–20 t/h of finished charcoal. The band is wide on purpose: bulk density, moisture, the product size and the recirculating load all move the number. We confirm the figure in writing for your material before the order, and the commissioning test has to hold it.

How much power does a charcoal line need?

Installed power runs 30–250 kW plus thermal input. Starting current matters more than running current for generator sizing, so tell us if the site has no grid supply. We can specify a soft starter or a variable frequency drive where the supply is weak.

Which wear parts does a charcoal line consume?

The recurring items are kiln refractory, screw conveyors, seals. Life depends on the silica content and the crushability of the rock. We ask for a sieve analysis and, where possible, a Bond work index so the first wear kit is sized to the duty instead of a generic default.

When should I choose a charcoal line over an alternative?

Choose it when your duty is coconut shell, bamboo, wood chips and sawdust. Where that is not the case, a batch retort where the feedstock arrives irregularly is often the better fit. The decision should follow the material and the product spec, not the price of the machine alone.

What does a charcoal line cost?

Price depends on the model, the drive, the wear alloy and the automation level. A single unit is quoted as a machine price; a line is quoted stage by stage with the steelwork and electricals separated, so you can see what each part contributes. We do not publish list prices because freight and configuration move them too much.

How long does installation take for a charcoal line?

A single unit is usually set, aligned and test run in two to four days with a competent local crew. A line with a charcoal line at its centre takes two to four weeks, including steelwork, chutes, electricals and the commissioning checks. We supply a day-by-day plan with the drawings.

What maintenance does a charcoal line need?

Daily: walk-around, grease points, belt tension, unusual noise. Weekly: wear measurement, bolt torque, screen or liner inspection. Monthly: oil sampling where the drive is oil-lubricated, alignment check, electrical insulation test. The manual lists every interval against the part, and the first-year kit covers the consumables.

What is the most common failure on a charcoal line?

Loose foundations and overloaded drives account for most early failures, not the castings. A machine that shakes will crack its frame within a season. The second most common cause is feeding beyond the designed top size. Both are preventable with the installation checks we supply.

Can a charcoal line handle wet or sticky material?

Only with preparation. Wet feed reduces throughput, blinds screens and packs chutes. The usual fixes are a pre-screen, a grizzly, steeper chutes, rubber media and, for clay, a scrubber. We would rather redesign the front of the circuit than sell a bigger charcoal line and hope.

What information do you need to size a charcoal line?

Top feed size, target tonnage per hour, hours per day, product sizes required, bulk density, moisture, silica content if known, power available, and the site altitude and climate. Photographs of the feed and the existing circuit help more than a long description.

Is a charcoal line available for hire or as a used unit?

Used units appear in our used machinery section after inspection, with a report on the frame, the drive and the wear parts. Hire is handled through local partners rather than from the factory, because mobilisation and site support have to be close to the job.

What size feed can a pyrolysis line take?

For pyrolysis line duties the practical feed limit is shredded tyres below 50 mm, plastic flakes, or oil sludge. Anything larger needs a breaker or a larger primary unit. We size the opening from the 95th percentile of your blast or excavation size, not the average, because the oversized lumps are what cause the stalls.

What capacity should I expect from a pyrolysis line?

5–50 t/day per reactor train. The band is wide on purpose: bulk density, moisture, the product size and the recirculating load all move the number. We confirm the figure in writing for your material before the order, and the commissioning test has to hold it.

How much power does a pyrolysis line need?

Installed power runs 40–180 kW. Starting current matters more than running current for generator sizing, so tell us if the site has no grid supply. We can specify a soft starter or a variable frequency drive where the supply is weak.

Which wear parts does a pyrolysis line consume?

The recurring items are reactor shell, seals, condenser tubes, burner nozzle. Life depends on the silica content and the crushability of the rock. We ask for a sieve analysis and, where possible, a Bond work index so the first wear kit is sized to the duty instead of a generic default.

When should I choose a pyrolysis line over an alternative?

Choose it when your duty is end-of-life tyres, mixed plastic and oil-bearing waste. Where that is not the case, a continuous screw reactor where the site needs 24-hour operation and stable power is often the better fit. The decision should follow the material and the product spec, not the price of the machine alone.

What does a pyrolysis line cost?

Price depends on the model, the drive, the wear alloy and the automation level. A single unit is quoted as a machine price; a line is quoted stage by stage with the steelwork and electricals separated, so you can see what each part contributes. We do not publish list prices because freight and configuration move them too much.

How long does installation take for a pyrolysis line?

A single unit is usually set, aligned and test run in two to four days with a competent local crew. A line with a pyrolysis line at its centre takes two to four weeks, including steelwork, chutes, electricals and the commissioning checks. We supply a day-by-day plan with the drawings.

What maintenance does a pyrolysis line need?

Daily: walk-around, grease points, belt tension, unusual noise. Weekly: wear measurement, bolt torque, screen or liner inspection. Monthly: oil sampling where the drive is oil-lubricated, alignment check, electrical insulation test. The manual lists every interval against the part, and the first-year kit covers the consumables.

What is the most common failure on a pyrolysis line?

Loose foundations and overloaded drives account for most early failures, not the castings. A machine that shakes will crack its frame within a season. The second most common cause is feeding beyond the designed top size. Both are preventable with the installation checks we supply.

Can a pyrolysis line handle wet or sticky material?

Only with preparation. Wet feed reduces throughput, blinds screens and packs chutes. The usual fixes are a pre-screen, a grizzly, steeper chutes, rubber media and, for clay, a scrubber. We would rather redesign the front of the circuit than sell a bigger pyrolysis line and hope.

What information do you need to size a pyrolysis line?

Top feed size, target tonnage per hour, hours per day, product sizes required, bulk density, moisture, silica content if known, power available, and the site altitude and climate. Photographs of the feed and the existing circuit help more than a long description.

Is a pyrolysis line available for hire or as a used unit?

Used units appear in our used machinery section after inspection, with a report on the frame, the drive and the wear parts. Hire is handled through local partners rather than from the factory, because mobilisation and site support have to be close to the job.

What size feed can a recycling line take?

For recycling line duties the practical feed limit is demolition rubble up to 800 mm, or baled MSW depending on the route. Anything larger needs a breaker or a larger primary unit. We size the opening from the 95th percentile of your blast or excavation size, not the average, because the oversized lumps are what cause the stalls.

What capacity should I expect from a recycling line?

30–500 t/h. The band is wide on purpose: bulk density, moisture, the product size and the recirculating load all move the number. We confirm the figure in writing for your material before the order, and the commissioning test has to hold it.

How much power does a recycling line need?

Installed power runs 75–450 kW. Starting current matters more than running current for generator sizing, so tell us if the site has no grid supply. We can specify a soft starter or a variable frequency drive where the supply is weak.

Which wear parts does a recycling line consume?

The recurring items are jaw plates, blow bars, screen decks, magnetic belt cleats. Life depends on the silica content and the crushability of the rock. We ask for a sieve analysis and, where possible, a Bond work index so the first wear kit is sized to the duty instead of a generic default.

When should I choose a recycling line over an alternative?

Choose it when your duty is construction and demolition waste, slag and municipal waste. Where that is not the case, a mobile train where the material moves between sites is often the better fit. The decision should follow the material and the product spec, not the price of the machine alone.

What does a recycling line cost?

Price depends on the model, the drive, the wear alloy and the automation level. A single unit is quoted as a machine price; a line is quoted stage by stage with the steelwork and electricals separated, so you can see what each part contributes. We do not publish list prices because freight and configuration move them too much.

How long does installation take for a recycling line?

A single unit is usually set, aligned and test run in two to four days with a competent local crew. A line with a recycling line at its centre takes two to four weeks, including steelwork, chutes, electricals and the commissioning checks. We supply a day-by-day plan with the drawings.

What maintenance does a recycling line need?

Daily: walk-around, grease points, belt tension, unusual noise. Weekly: wear measurement, bolt torque, screen or liner inspection. Monthly: oil sampling where the drive is oil-lubricated, alignment check, electrical insulation test. The manual lists every interval against the part, and the first-year kit covers the consumables.

What is the most common failure on a recycling line?

Loose foundations and overloaded drives account for most early failures, not the castings. A machine that shakes will crack its frame within a season. The second most common cause is feeding beyond the designed top size. Both are preventable with the installation checks we supply.

Can a recycling line handle wet or sticky material?

Only with preparation. Wet feed reduces throughput, blinds screens and packs chutes. The usual fixes are a pre-screen, a grizzly, steeper chutes, rubber media and, for clay, a scrubber. We would rather redesign the front of the circuit than sell a bigger recycling line and hope.

What information do you need to size a recycling line?

Top feed size, target tonnage per hour, hours per day, product sizes required, bulk density, moisture, silica content if known, power available, and the site altitude and climate. Photographs of the feed and the existing circuit help more than a long description.

Is a recycling line available for hire or as a used unit?

Used units appear in our used machinery section after inspection, with a report on the frame, the drive and the wear parts. Hire is handled through local partners rather than from the factory, because mobilisation and site support have to be close to the job.

Factory direct

Tell us your feed material and target output

We size the machine or line, confirm power and layout, and send a written quotation within one working day.