The project adopts a combined gravity separation, magnetic separation, and spodumene flotation process.
After crushing and grinding, slurry is deslimed before entering spiral chutes and shaking tables for tantalum-niobium recovery.
Weak magnetic minerals are recovered through magnetic separation, while spodumene is upgraded through flotation.