Construction & demolition
Construction Waste Recycling Plant
Rubble to specification aggregate: jaw or impact reduction, magnetic steel removal, screening and dust control.
Mass balance and layout issued with the proposal
Rubble to specification aggregate: jaw or impact reduction, magnetic steel removal, screening and dust control.
What the line includes
- Feed preparation sized to the analysis, not to a catalogue default
- Reactor, kiln or reduction stage with the drive matched to the duty cycle
- Product handling, cooling, separation and packing
- Off-gas, dust and effluent treatment within the scope
- Commissioning on the customer’s own feed and operator training
Numbers we need
Feedstock analysis (moisture, ash, contamination), tonnage per day, hours of operation, product specification and the offtake arrangement. The mass and energy balance follows from those, and the price follows from the balance.
Site requirements
A level concrete slab, power at the stated voltage, water for cooling where the design needs it, and a route for the residue. For thermal lines, the local emission rules decide the gas treatment scope, so send the permit conditions with the enquiry.